Norway Gives Go-Ahead For JSF Production Agreement | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jan 23, 2007

Norway Gives Go-Ahead For JSF Production Agreement

US Entrant Still One Of Three Possibles For Fighter Contract

Norwegian Defense Minister Anne-Grete Strom-Erichsen has decided to sign the production phase agreement for the Joint Strike Fighter Program. Officials also report progress in negotiations over development agreements with the two other candidates in the combat aircraft acquisition project, JAS Gripen and Eurofighter.

ANN has learned Norway withheld a signature on the production agreement Memorandum of Understanding (MOU) up to now "...in order to achieve more tangible (industrial participation) agreements for Norwegian industry in the JSF program."

Norwegian government officials say they've achieved concessions substantial enough regarding the agreement to continue participation in the multinational JSF collaboration. The agreement allows Norway to continue its participation in the JSF program while maintaining competition between the three contenders for the country's next combat aircraft acquisition.

"We now believe that the industrial cooperation plans have become significantly more concrete, and based on an overall evaluation have therefore decided to move into the production phase. We have always been very explicit with regards to emphasizing the importance of industrial cooperation. I am also pleased that we have achieved our goal of maintaining competition between the three contenders and expect to have agreements on development cooperation with all three candidates before long," says Strom-Erichsen.

Last December the Norwegian government decided to continue with three candidates in its combat aircraft acquisition, and authorized the Minister of Defense to sign the JSF production agreement if an understanding regarding the level of the country's "industrial participation" was reached.

At the same time, Norway's government tells ANN it also decided to negotiate agreements on development cooperation with JAS Gripen and Eurofighter. Norway government officials say negotiations with JAS Gripen and Eurofighter, which commenced early January 2007, are well on track.

Norway hasn't set a date to sign the JSF production phase agreement, only saying it will do so "shortly."

FMI: www.lockheedmartin.com, www.state.gov, www.odin.dep.no/fd/english/bn.html

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC