SpaceX Aborts Starhopper Test In Last Seconds Of Countdown | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Aug 28, 2019

SpaceX Aborts Starhopper Test In Last Seconds Of Countdown

Demonstration Flight Was Planned for An Altitude Of 500 Feet

SpaceX aborted a planned demonstration flight of its reusable Starhopper prototype Monday as the countdown clock ticked down to zero. The mission was planned to launch the squat test article to an altitude of 500 feet and then land gently back on the ground. But when the clock reached zero, the single Raptor engine on the Starhopper did not ignite.

Space.com reports that SpaceX CEO Elon Musk said in a tweet that the issue may have been in the igniters for the company's newest engine.  "Raptor uses dual redundant torch igniters. Better long-term, but more finicky in development," Musk wrote in a Twitter statement.

It looked like there might be a second try on Monday, but Musk later Tweeted "Igniters need to be inspected. We will try again tomorrow same time."

That would have been late Tuesday, but Wednesday was also considered to be an option.

For SpaceX operations in Texas, the Cameron County Sheriff's department has to close roads for several hours. Residents were informed about the tests, suggesting they go outside during the test in the event that windows are broken during a launch, or there is an accident or explosion.

Starhopper completed two tethered tests earlier this year, and conducted its first free flight to an altitude of about 65 feet on July 25. This test, when it happens, will be the last for this prototype, according to Musk.

(Image from file)

FMI: Source report

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC