Adding Insult To Injury: Boeing to Pay at Least $17M to FAA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Fri, May 28, 2021

Adding Insult To Injury: Boeing to Pay at Least $17M to FAA

Required To Settle Enforcement Cases on 737 -- Will Also, "Undertake Multiple Corrective Actions"

Boeing will pay at least $17 million in penalties and undertake multiple corrective actions with its production under a settlement agreement with the FAA.

The FAA found that the Chicago-based manufacturer installed equipment on 759 Boeing 737 MAX and NG aircraft containing sensors that were not approved for that equipment; submitted approximately 178 Boeing 737 MAX aircraft for airworthiness certification when the aircraft potentially had nonconforming slat tracks installed; and improperly marked those slat tracks.

“Keeping the flying public safe is our primary responsibility. That is not negotiable, and the FAA will hold Boeing and the aviation industry accountable to keep our skies safe,” said FAA Administrator Steve Dickson.

Boeing will pay the $17 million penalty within 30 days after signing the agreement. If Boeing does not complete certain corrective actions within specific timeframes, the FAA will levy up to $10.1 million in additional penalties.

The corrective actions include but are not limited to:

  • Strengthening procedures to ensure that it does not install on aircraft any parts that fail to conform to their approved design.
  • Performing Safety Risk Management analyses to determine whether its supply-chain oversight processes are appropriate and whether the company is ready to safely increase the Boeing 737 production rate.
  • Revising its production procedures to enable the FAA to observe production rate readiness assessments, the data on which the company bases the assessments, and the results of the assessments.
  • Taking steps to reduce the chance that it presents to the FAA aircraft with nonconforming parts for airworthiness certification or a Certificate of Export.
  • Enhancing processes to improve its oversight of parts suppliers.

The FAA will continue its oversight of Boeing’s engineering and production activities and is actively implementing oversight provisions from the 2020 Aircraft Certification, Safety, and Accountability Act. 

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (07.10.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

NTSB Prelim: Cessna 172

The Airplane Came To Rest Underneath A Set Of Damaged Power Distribution Lines On The Floor Of A Coulee On June 19, 2025, at 1412 mountain daylight time, a Cessna 172K airplane, N7>[...]

ANN's Daily Aero-Linx (07.10.25)

Aero Linx: FAA Managers Association (FAAMA) Recognized by the FAA, FAAMA is a professional association dedicated to the promotion of excellence in public service. The Association i>[...]

Classic Aero-TV: The Big Business of Diminutive Powerplants

From 2023 (YouTube Edition): Jet Central Micro-Turbine Engines Impress Founded in the late-1990s, Mexico City-based Jet Central produces a unique and fascinating line of micro-turb>[...]

Airborne 07.11.25: New FAA Bos, New NASA Boss (Kinda), WB57s Over TX

Also: ANOTHER Illegal Drone, KidVenture Educational Activities, Record Launches, TSA v Shoes The Senate confirmed Bryan Bedford to become the next Administrator of the FAA, in a ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC