First Flight: Tranche 2 Eurofighter Typhoon | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Jan 17, 2008

First Flight: Tranche 2 Eurofighter Typhoon

The first Tranche 2 Eurofighter Typhoon has made its first flight at EADS Military Air Systems' site in Manching. Instrumented Production Aircraft Seven (IPA7) was piloted by EADS Test Pilot Chris Worning.

The aircraft, a German single seat variant, represents the full Tranche 2 build standard and its first prominent task will be to accomplish Type Acceptance for Block 8, the first capability standard of Tranche 2, in April 2008. This work will be carried out together with the BAE Systems-operated IPA6 based at Warton. IPA6 (BS031) is essentially a Tranche 1 standard aircraft but utilises the full Tranche 2 mission computer suite and avionics features. The first series of EJ200 engine flight testing for Tranche 2 was successfully concluded at the end of November with IPA2 in Italy.

The significant Tranche 2 capabilities focus mainly on the new mission computers which deliver the higher processing and memory capacity required for the integration of future weapons such as Meteor, Storm Shadow and Taurus. Differences in the build standard to Tranche 1 are related to changes in production technology or obsolescence.

Based on the Tranche 2 production contract, signed on 14 December 2004, and the original export contract with Austria, the Eurofighter consortium will deliver 251 Tranche 2 weapon systems: 91 to the United Kingdom, 79 to Germany (including 15 aircraft originally contracted by Austria), 47 to Italy and 34 to Spain. Deliveries of Tranche 2 Eurofighter Typhoons to all four Partner Nations will begin in Summer 2008 and are scheduled to run until 2013. 32 aircraft are already in final assembly at the partner companies Alenia Aeronautica, BAE Systems, EADS CASA and EADS Deutschland.

FMI: www.eurofighter.com

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC