Private Japanese Spacecraft Prepares for Lunar Landing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Sat, May 10, 2025

Private Japanese Spacecraft Prepares for Lunar Landing

Ispace Begins One-Month Countdown as its Resilience Lander Enters Lunar Orbit

Tokyo-based aerospace company ispace announced on May 7 that its lunar lander, dubbed Resilience, has made its way into orbit around the moon. The spacecraft is now officially one month out from its inaugural lunar landing.

Resilience launched on January 15, 2025, from NASA’s Kennedy Space Center near Titusville, Florida. The SpaceX Falcon 9 rocket also carried Firefly Aerospace’s Blue Ghost lunar lander, which took a slightly faster path and successfully touched down on the moon on March 2.

The landing was upright, stable, and within 100 meters of its landing target near Mons Latreille, making Firefly the first commercial company to have its tech successfully touchdown on the moon. Blue Ghost completed its NASA mission on March 16 after dropping off 10 instruments and capturing several photos and videos.

Just a few days later, American-based Intuitive Machines attempted a lunar landing of its own with its Athena spacecraft. However, it ended up sideways and was unable to recharge its solar batteries, resulting in its death. The company’s first lunar lander, Odysseus, met a similar demise in 2024.

Japanese manufacturer ispace is hoping for a more positive turnout. The HAKUTO-R M2 Resilience lunar lander is currently in lunar orbit and is targeting the first week of June to touch down. It is carrying a mini rover with a scoop to take a lunar dirt sample and perform several other experiments. If all goes well, the company will have redeemed itself for a pretty significant mission anomaly in 2023.

The ispace Hakuto-R lander was well on its way to becoming the first privately developed spacecraft to make a controlled landing on the moon when, on April 25, 2023, flight controllers lost contact. Days later, ispace confirmed that it had miscalculated its altitude due to a large cliff and plummeted three miles into the moon’s surface.

FMI: https://ispace-inc.com

Advertisement

More News

Aero-News: Quote of the Day (05.20.25)

“From the beginning, the RV-15X’s performance has been very good, as reported and demonstrated in videos. However, we’ve continued to work hard to achieve the con>[...]

ANN's Daily Aero-Term (05.20.25): Handoff

Handoff An action taken to transfer the radar identification of an aircraft from one controller to another if the aircraft will enter the receiving controller's airspace and radio >[...]

ANN's Daily Aero-Linx (05.20.25)

Aero Linx: The de Havilland Moth Club Ltd The de Havilland Moth Club evolved from a belief that an association of owners and operators of Moth aeroplanes should be formed to create>[...]

Airborne-NextGen 05.20.25: Drone Regs, Zero-Emission Cargo, Door-Dash Drone

Also: Blackhawk’s Replacement, Supersonic Flight, Archer 1Q/25, Long-Range VTOL Program U.S. Secretary of Transportation Sean P. Duffy released an update on progress being ma>[...]

Airborne 05.19.25: Kolb v Tornados, Philippine Mars, Blackhawk Antler Theft

Also: Tentative AirVenture Airshow Lineup, Supersonic Flight Regs, Private Pilot Oral Exam Guide, Boeing Deal The sport aircraft business can be a tough one... especially when Moth>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC