FAI Breaks Ground On New Hangar 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Sep 12, 2016

FAI Breaks Ground On New Hangar 8

Shares Progress On Construction Cam

FAI Asset Management GmbH, a Member of the Germany-headquartered FAI Aviation Group, has begun construction of a third hangar at Albrecht Dürer Airport in Nuremberg. Ground was broken for the latest FAI building – to be known as Hangar 8 – on 15 August following completion of road network infrastructure changes by the airport company.  The €6 million (approx. $6.73 million) project will result in a building comprised of hangar space and office areas. Designed in-house by FAI CEO Siegfried Axtmann, the additional building will mirror the existing FAI properties in style, and like the rest of the facility will also be carbon neutral.

The project’s progress can be watched via Construction Cam, which has been erected on FAI’s main building. “It’s a major construction and we thought this would be a great way to showcase its development to our colleagues around the world,” said Axtmann.

Completion is expected in March 2017. The additional space will be used for line maintenance work across a range of aircraft, including FAI’s fleet of exclusively Bombardier aircraft. FAI Technik, the in-house maintenance division of FAI Group is specialised in base and line maintenance of Bombardier aircraft. It has completed several heavy maintenance 8C and 12C checks on the Bombardier Global Express model, which included cabin refurbishments and modifications. The team has also worked through a number of 96/192 month-inspections on Challenger 604s, as well as 12 year/12,000 hours-inspections across the Learjet-family.

To support the maintenance expansion FAI Technik plans to further bolster its 60 strong team with the recruitment of ten more engineers to fulfill the extra requirements. “We have a great team of technical experts who maintain our own fleet, as well as the privately owned aircraft we manage. The new hangar gives us the opportunity to strengthen the numbers and add even more skills to our diverse range of expertise,” said Axtmann.

Axtmann anticipates that the hangar will also be used for aircraft storage. “The increased capacity will support FAI’s expansion into the aircraft storage market. The number of aircraft being put up for sale in Europe is increasing and there is a growing demand for air conditioned hangar space in which to keep them in mint condition before a sale take place,” he said

FAI’s current site already incorporates administration offices, a fully serviced FBO, FAI’s 24/7 Air Ambulance Operation Center, component shops and training facilities for FAI staff. The existing Hangars 6 and 7 will continue to serve base maintenance needs.

(Source: FAI news release. Image provided)

FMI: www.fai.ag

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC