Boeing Promises 747-8 Will Hit Numbers | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.14.25

Airborne-NextGen-07.15.25

AirborneUnlimited-07.16.25

Airborne-FlightTraining-07.17.25

AirborneUnlimited-07.11.25

Fri, Mar 02, 2012

Boeing Promises 747-8 Will Hit Numbers

Huge Plane Is Heavier, Thirstier, Later Than Projected

It's not unusual for a new aircraft built with composite technology to have production fall behind schedule. But Boeing's 747-8 is a variation on the 747 theme that dates back more than 40 years, stretched to carry up to 467 passengers. The longer version uses of new wings and engines, but has wound up a year behind schedule, an estimated eight-11 tons overweight, and less fuel-efficient than projected.

The company is pushing positive spin. Spokesman Jim Proulx tells Reuters, "The planes delivered so far have been performing very well in service, about one percent better than we thought. They are giving double-digit (percentage improvements) in fuel burn and are on a path to getting back to catalog commitments in 2014."

"Catalog commitments" refers to the numbers customers expected when they signed on the line. When the early production models weren't hitting their numbers, Cargolux, which was supposed to be the launch customer for the type, refused to accept  initial delivery of the first 747-8 freighter last September.

Boeing VP Randy Tinseth concedes, "As with all new airplanes, we have certainly had our challenges with weight. We are working on reducing these and improving the capabilities."

Since the first deliveries, Boeing has upgraded the max takeoff weight by six tons, which could help it meet the combination of range and payload advertised.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (07.15.25): Charted Visual Flight Procedure Approach

Charted Visual Flight Procedure Approach An approach conducted while operating on an instrument flight rules (IFR) flight plan which authorizes the pilot of an aircraft to proceed >[...]

Aero-News: Quote of the Day (07.15.25)

“When l became the Secretary of Defense, I committed to rebuild our military to match threats to capabilities. Drones are the biggest battlefield innovation in a generation, >[...]

ANN's Daily Aero-Linx (07.15.25)

Aero Linx: Stearman Restorers Association Welcome to the Stearman Restorers Association. The Stearman Restorers Association is an independent “Not for Profit” 501C-3 Co>[...]

NTSB Final Report: Kjelsrud Gary Kitfox

Airplane Exhibited A Partial Loss Of Engine Power When It Was About Halfway Down The Runway Analysis: The pilot of the experimental amateur-built airplane was departing from his pr>[...]

NTSB Prelim: Cessna A150L

The Flight Path Was Consistent With Low-Altitude Maneuvering On June 18, 2025, about 0922 mountain standard time, a Cessna A150L airplane, N6436F, was substantially damaged when it>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC