Boeing's P-8A Poseidon test aircraft T-1 successfully completed
its first flight April 25th, taking off from Renton Field at 10:43
a.m. and touching down at Boeing Field in Seattle at 2:14 p.m. The
P-8A performed a series of flight checks, reached a maximum
altitude of 25,000 feet, and landed after three hours, 31 minutes
in the air.