AD: Sikorsky Aircraft Corporation Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Nov 29, 2017

AD: Sikorsky Aircraft Corporation Helicopters

AD NUMBER: 2017-19-01

PRODUCT: Sikorsky Aircraft Corporation (Sikorsky) Model S-76A, S-76B, S-76C, and S-76D helicopters.

ACTION: Final Rule.

SUMMARY: This AD requires inspecting the main rotor (M/R) servo pushrod (pushrod) assembly and applying slippage marks.

This AD was prompted by an accident of a Sikorsky Model S-76C helicopter caused by a failed pushrod assembly.

The actions of this AD are intended to prevent an unsafe condition on these products.

COST: The FAA estimates that this AD affects 198 helicopters of U.S. Registry.

Labor costs are estimated at $85 per work-hour. Inspecting the M/R pushrod assemblies takes about 2.2 work-hours for an estimated cost of $187 per helicopter and $37,026 for the U.S. fleet. Replacing an M/R pushrod assembly takes about 2 work-hours for a labor cost of $170. Parts to replace M/R pushrod assembly P/N 76400-00034-059 cost about $2,411 for a total estimated replacement cost of $2,581.

Parts to replace M/R pushrod assembly P/N 76400-00014-074 cost about $2,224 for a total estimated replacement cost of $2,394. Parts to replace M/R pushrod assembly P/N 76400-00014-076 cost about $2,488 for a total estimated replacement cost of $2,658. Parts to replace M/R pushrod assembly P/N 76400-00014-077 cost about $2,414 for a total estimated replacement cost of $2,584. It takes a minimal amount of time to apply the slippage marks for a negligible cost.

DATES: This AD is effective January 2, 2018.

FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (11.26.25)

“We are disappointed with today’s verdict and respectfully disagree with the outcome. From the outset, we have maintained that Gogo’s independently developed 5G t>[...]

ANN's Daily Aero-Term (11.26.25): Takeoff Hold Lights (THL)

Takeoff Hold Lights (THL) The THL system is composed of in-pavement lighting in a double, longitudinal row of lights aligned either side of the runway centerline. The lights are fo>[...]

ANN's Daily Aero-Linx (11.26.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

Airborne Affordable Flyers 11.20.25: Sonex $$$, SnF 26 MOSAIC DAY, P. Ponk STCs

Also: Elfin 20 Journey, BASE Jumper Rescue, Pipistrel Makes Waves, EAA Hall of Fame, Affordable Flying Expo 2026 Like most of the industry, kit manufacturer Sonex has been hit by t>[...]

ANN's Daily Aero-Linx (11.27.25)

Aero Linx: The de Havilland Moth Club Ltd The de Havilland Moth Club evolved from a belief that an association of owners and operators of Moth aeroplanes should be formed to create>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC