FAA: Put Down The Shovels And Step Away From The Landfill | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Oct 12, 2004

FAA: Put Down The Shovels And Step Away From The Landfill

Agency Orders Work Halted On Landfill Near Williamson County Airport

Developers of a Southern Illinois landfill will have to stop work immediately, after the FAA said they hadn't filed the proper paperwork.

As ANN reported in August, government officials were worried that the landfill was too close to the airport. Moreover, the FAA says the developer of the 189-acre landfill is thinking about changing the purpose of the landfill from household waste to demolition or construction waste. But FAA spokesman Tony Molinaro said the Kibler Development Corporation hadn't filed any paperwork on the change. No paperwork, no landfill.

The site, which was already being surveyed by Kibler, is close to the Williamson County Airport near Marion (IL). While the company had planned to finish an access road into the site, Molinaro told the Southern Illinoisan that Kibler "must first file paperwork asking us to do a compatibility study. Nothing can be pursued (on their end) until that study is completed and we come to a decision on whether or not to grant permission for that construction."

Molinaro said a compatibility study would take 60 to 90 days to complete.

"We look at the safety of the airport first," he told the Southern Illinoisan. "If we can be assured that the landfill will be used only for construction waste and not grow beyond a certain height, then and only then may permission be granted to build the landfill.

"But let me make it clear that we will need exact information from the developer about the location of the landfill, for example, what kind of waste will be disposed, the projected lifespan of the landfill, and more."

The issue with household garbage is that it can rot, creating explosive gases. Kibler says, by switching from a household waste landfill to a demolition landfill, the company needs no approval from the FAA. Molinaro says, think again. 

FMI: www.faa.gov


Advertisement

More News

NTSB Final Report: Piper PA-44-180

While On The Base Leg Of The Airport Traffic Pattern The Right Main Landing Gear Did Not Fully Extend Analysis: Both pilots reported that after performing airwork they returned to >[...]

Classic Aero-TV: The Bizarre Universe of Klyde Morris Cartoons

From 2023 (YouTube Edition): Putting the ANT in Antihero A Beech Starship speeds along at altitude. “Deflectors on!” a voice from within the aircraft cries. “Look>[...]

ANN's Daily Aero-Term (11.09.25): Minimum Friction Level

Minimum Friction Level The friction level specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, that represents the m>[...]

Aero-News: Quote of the Day (11.09.25)

“Beginning this aircraft subsystem testing is the culmination of more than a decade of focused engineering and certification refinements. This is the moment where our intende>[...]

Classic Aero-TV: Falling for Para-Phernalia’s Softie Emergency Parachutes

From 2023 (YouTube Edition): The Best Option for A Pilots’ Worst Days Since its 1979 founding, Para-Phernalia, Inc. has designed and manufactured the Softie line of pilot eme>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC