NASA, Russia Extend Space Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, May 30, 2009

NASA, Russia Extend Space Contract

Soyuz Service Available Through 2013

NASA has signed a $306 million modification to the current International Space Station contract with the Russian Federal Space Agency for crew transportation and related services in 2012 and 2013.

The firm-fixed price modification covers comprehensive Soyuz support, including all necessary training and preparation for launch, crew rescue, and landing of a long-duration mission for six individual station crew members.

Space station crew members will launch on four Soyuz vehicles: two in spring 2012 and two in fall 2012. Their landings are scheduled for fall 2012 and spring 2013, respectively. The contract changes also provide for crew post-flight rehabilitation, medical exams and services.

Under the revised contract, the Soyuz flights will carry limited cargo to and from the station, and dispose of trash. The cargo allowed per person is approximately 110 pounds launched to the station, approximately 37 pounds returned to Earth, and trash disposal of approximately 66 pounds.

Three new crew members arrived at the International Space Station aboard a Soyuz vehicle at 0834 EDT Friday following a Wednesday launch from Kazakhstan. Flight engineers Roman Romanenko, Robert Thirsk and Frank De Winne spent two days in space aboard the Soyuz TMA-15 spacecraft before docking to the earth-facing port of the Zarya module.  It marks the first time all 5 of the ISS partner agencies are represented onboard at the same time.

FMI: www.nasa.gov

Advertisement

More News

NTSB Final Report: Piper PA-44-180

While On The Base Leg Of The Airport Traffic Pattern The Right Main Landing Gear Did Not Fully Extend Analysis: Both pilots reported that after performing airwork they returned to >[...]

Classic Aero-TV: The Bizarre Universe of Klyde Morris Cartoons

From 2023 (YouTube Edition): Putting the ANT in Antihero A Beech Starship speeds along at altitude. “Deflectors on!” a voice from within the aircraft cries. “Look>[...]

ANN's Daily Aero-Term (11.09.25): Minimum Friction Level

Minimum Friction Level The friction level specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, that represents the m>[...]

Aero-News: Quote of the Day (11.09.25)

“Beginning this aircraft subsystem testing is the culmination of more than a decade of focused engineering and certification refinements. This is the moment where our intende>[...]

Classic Aero-TV: Falling for Para-Phernalia’s Softie Emergency Parachutes

From 2023 (YouTube Edition): The Best Option for A Pilots’ Worst Days Since its 1979 founding, Para-Phernalia, Inc. has designed and manufactured the Softie line of pilot eme>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC