FAA To Hold Meetings On KCLT Environmental Study | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.12.25

Airborne-NextGen-05.13.25

AirborneUnlimited-05.14.25

Airborne-FlightTraining-05.15.25

AirborneUnlimited-05.16.25

Mon, Mar 26, 2018

FAA To Hold Meetings On KCLT Environmental Study

Two Sessions Planned In Late April

The FAA will host public scoping meetings next month for the Environmental Impact Statement (EIS) for Charlotte Douglas International Airport’s (KCLT) proposed fourth parallel runway and other projects. The meetings will help residents learn about the Airport’s proposed projects, and help define the purpose and scope of the study.  Charlotte’s Airport Capacity Enhancement Plan (ACEP) recommended that the airport complete a 12,000-foot-long runway by 2023, along with other airfield and terminal improvements to accommodate future aviation demand.

The public scoping meetings will be at 7 p.m. on Tuesday, April 24, 2018, at Embassy Suites, 4800 S. Tryon St, Charlotte, NC 28217; and at 7 p.m. on Thursday, April 26, 2018, at the West Mecklenburg High School Cafeteria, 7400 Tuckaseegee Rd, Charlotte, NC 28214.

The meetings will include an open house where residents can view displays covering environmental topics that the study will cover and a presentation on the Airport’s proposed projects. Attendees also may make private comments to a stenographer, complete and submit a comment card, or enter a comment on a computer terminal during the meetings. Residents also may mail a comment card or submit an email to CLTEIS@faa.gov or via Regulations.gov. The comment period is open until May 7, 2018. However, we will continue to accept comments throughout the EIS process and we will respond to all comments in the Draft EIS.

The FAA is conducting the EIS, in accordance with the National Environmental Policy Act (NEPA), and scoping is a required part of the process. The CLT EIS will evaluate the potential direct, indirect, and cumulative environmental impacts that may result from the Airport’s proposed projects. The projects include a 12,000-foot-long fourth parallel Runway 1/19 between existing Runway 18/36 Center and Runway 18 Right/36 Left, associated taxiways including a partial north End Around Taxiway, full south End Around Taxiway, parallel, high-speed exit and connector taxiways. Construction of the new runway along with terminal and ramp expansion projects would require the decommissioning of Runway 5/23 and relocation of West Boulevard.

The EIS will consider a range of reasonable alternatives that could potentially meet the purpose and need for the proposed projects and it will evaluate a No Action Alternative.  The FAA expects to complete the EIS in 2020.

The FAA’s most recent Terminal Area Forecast (TAF) projects that the number of flights at CLT will grow at an average rate of 1.85 percent annually from more than 545,000 operations in 2016 to 745,000 operations in 2033. In 2016, the Airport served more than 21.7 million passengers, which the FAA expects to grow to more than 31.5 million by 2033.

(Source: FAA news release. Image from file)

FMI: www.faa.gov

Advertisement

More News

NTSB Prelim: Hy-Tek Hurricane HP

About 100 Ft Above Ground Level, The Engine Lost Total Power On April 14, 2025, about 1003 Pacific daylight time, an experimental amateur-built Hy-Tek Hurricane HP, N9088G, was sub>[...]

ANN's Daily Aero-Term (05.14.25): Flight Check

Flight Check A call-sign prefix used by FAA aircraft engaged in flight inspection/certification of navigational aids and flight procedures. The word “recorded” may be a>[...]

Aero-News: Quote of the Day (05.14.25)

“While our traditional mechanical magnetos will be around for a long time, Hartzell Engine Tech acquired E-MAG to expand its PowerUP Ignition System product portfolio into bo>[...]

ANN's Daily Aero-Term (05.15.25): Primary Radar

Primary Radar A radar system in which a minute portion of a radio pulse transmitted from a site is reflected by an object and then received back at that site for processing and dis>[...]

Airborne 05.12.25: $1M Flying Car, Marion Airport Saved, AirVenture Cup

Also: ‘Sonoran Beauty’ Jump-Qualified, IAG Orders, FAA Shuts Down ATC Oversight, EAA Joins Modern Skies Slovakia-based developer Klein Vision recently unveiled the prod>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC