F-35 Flies First Training Sortie At Luke AFB | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.12.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-AffordableFlyers-05.08.25

AirborneUnlimited-05.09.25

Thu, May 15, 2014

F-35 Flies First Training Sortie At Luke AFB

Academic Training Center Under Construction, Completion Expected In September

An F-35 Lightning II took to the sky over the West Valley at Luke AFB in Arizona May 5 in what was the first local training sortie for the fifth-generation fighter jet.

The jet is currently the only F-35 at Luke Air Force Base  with additional jets expected to arrive within the next few weeks.

"The ability to conduct local flight operations demonstrates the commitment by thousands of individuals who have worked to make this a reality," said Lt. Col. Michael Ebner, the 61st Fighter Squadron commander. "Our first sortie this week represents a significant milestone in the F-35 program at Luke (AFB)."

There are currently six F-35 pilots assigned to the 61st FS. There will eventually be approximately 30 pilots by the time the squadron is up to full capacity.

The 61st FS coordinates with the 61st Aircraft Maintenance Unit, which maintains the aircraft, to fly the jet when it is available -- which, as of this week, is approximately 1-2 times per day. That number could increase to 2-4 sorties a day by next month, when more jets are expected at Luke AFB, Ebner said.

Construction, much of which is sub-contracted locally, continues on base to prepare for the arrival of additional F-35s.

The Academic Training Center, which will house classrooms and 12 F-35 simulators, is under construction and is expected to be completed in late September. Construction is also underway on the combined Operations/AMU building for the second F-35 squadron.

Other projects, including the third Operations/AMU building, a maintainer training facility and a four-bay F-35 hangar are also in planning stages.

(USAF Image)

FMI: www.af.mil

Advertisement

More News

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

ANN's Daily Aero-Term (05.13.25): Cleared For The Option

Cleared For The Option ATC authorization for an aircraft to make a touch-and-go, low approach, missed approach, stop and go, or full stop landing at the discretion of the pilot. It>[...]

Aero-News: Quote of the Day (05.13.25)

“...no entity, whether a division of government or a private company or corporation, may use information broadcast or collected by automatic dependent surveillance-broadcast >[...]

Aero-News: Quote of the Day (05.14.25)

“While our traditional mechanical magnetos will be around for a long time, Hartzell Engine Tech acquired E-MAG to expand its PowerUP Ignition System product portfolio into bo>[...]

ANN's Daily Aero-Term (05.14.25): Flight Check

Flight Check A call-sign prefix used by FAA aircraft engaged in flight inspection/certification of navigational aids and flight procedures. The word “recorded” may be a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC