NTSB Issues Second Update On British Airways Engine Fire At Las Vegas | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Oct 07, 2015

NTSB Issues Second Update On British Airways Engine Fire At Las Vegas

Finds A Portion Of The Stage 8-10 Spool Failed

As part of its ongoing investigation into the September 8, 2015, engine fire during takeoff of British Airways flight 2276, a Boeing 777, at McCarran International Airport, Las Vegas, the NTSB has released additional information about the uncontained engine failure.

NTSB investigators disassembled and documented the GE90 engine at the GE facility in Evandale, Ohio. Group members from the FAA, GE, and Boeing, along with the United Kingdom’s accredited representative from the Air Accidents Investigation Branch and their technical advisor, British Airways, were in attendance.

Engine examination revealed that a portion of the stage 8-10 spool in the high-pressure compressor (HPC) section had failed, liberating fragments that breached the engine case and cowling. Additional pieces of the HPC spool were recovered from inside the engine and retained for metallurgical examination.

The NTSB Materials Laboratory examined engine parts gathered from the scene. HPC parts recovered during the disassembly of the engine were examined at the GE facility. All pieces of the damaged stage 8 disk rim have been collected.

The fracture initiated in the HPC stage 8 disk web, a part of the stage 8-10 spool. The NTSB will continue metallurgical evaluations of the disk and the fracture features.

The NTSB said GE is performing high-priority, focused inspections of HPC hardware from other GE90 engines. The inspection data is being gathered to support the investigation and to determine further investigative actions.

Additional updates will be provided as new factual information is developed.

(Source: NTSB news release. Image from file)

FMI: www.ntsb.gov

Advertisement

More News

ANN's Daily Aero-Term (12.04.25): Cooperative Surveillance

Cooperative Surveillance Any surveillance system, such as secondary surveillance radar (SSR), wide-area multilateration (WAM), or ADS-B, that is dependent upon the presence of cert>[...]

ANN's Daily Aero-Linx (12.04.25)

Aero Linx: OX5 Aviation Pioneers Incorporated in 1955 as a Pa 501 (c)(3) Not for Profit Corporation, the OX5 Aviation Pioneers is dedicated to bringing before the public the accomp>[...]

NTSB Prelim: Extra Flugzeugproduktions EA 300/SC

The Pilot Appeared To Regain Control After Six Rotations And Attempted To “Fly Out” Inverted But Had Insufficient Altitude On November 8, 2025, at 1038 eastern standard>[...]

Classic Aero-TV: The Bally Bomber - The All Time Ultimate Warbird Replica?

From 2018 (YouTube Edition): Aero-News Talks With The Airplane's Builder One of the many unique airplanes at AirVenture 2018 was a 1/3-scale B-17 bomber built by Jack Bally, who ta>[...]

ANN's Daily Aero-Linx (12.05.25)

Aero Linx: Society of U.S. Army Flight Surgeons (SoUSAFS) The Society of US Army Flight Surgeons (SoUSAFS) serves to advance the science and art of Aerospace Medicine and its allie>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC