Uh, Oooopss... Problems With Virgin Galactic Flight 06 Reported to FAA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-08.04.25

Airborne-NextGen-08.05.25

AirborneUnlimited-08.06.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Wed, Feb 07, 2024

Uh, Oooopss... Problems With Virgin Galactic Flight 06 Reported to FAA

Post-Flight Review Found An Alignment Pin Detached From The Mothership 

Virgin Galactic has admitted that during 'routine post-flight reviews' following its most recent spaceflight, ‘Galactic 06,’ the Company became aware that an alignment pin detached from the launch pylon of our mothership, VMS Eve, during flight. 

The Company notified the FAA on January 31 in accordance with regulations and is conducting a review in conjunction with the FAA.

The VG statement associated with this news asserts that "‘Galactic 06’ was a safe and successful flight that was conducted in accordance with Virgin Galactic’s rigorous flight procedures and protocols. At no time did the detached alignment pin pose a safety impact to the vehicles or the crew on board. Virgin Galactic flights occur in restricted airspace and at specific geographical launch locations that control the hazards to people or structures on the ground. The Company also observed no damage to the spaceship or the mothership."

The alignment pin helps ensure the spaceship is aligned to the mothership when mating the vehicles on the ground during pre-flight procedures. During mated flight, as the vehicles climb towards release altitude, the alignment pin helps transfer drag and other forces from the spaceship to the shear pin fitting assembly and into the pylon and center wing of the mothership. The shear pin fitting assembly remained both attached and intact on the mothership with no damage. While both parts play a role during mated flight, they do not support the spaceship’s weight, nor do they have an active function once the spaceship is released.

The alignment pin and shear pin fitting assembly reportedly performed as designed during the mated portion of the flight, and only the alignment pin detached after the spaceship was released from the mothership.

Virgin Galactic promises a further update at the completion of the review and will confirm the flight window for the ‘Galactic 07’ mission, which is planned for the second quarter of 2024.

FMI: www.virgingalactic.com

Advertisement

More News

NTSB Prelim: Scott Macwilliam SR3500 Moose

The Master Caution Light On The Instrument Panel Illuminated, And The Engine Experienced A Total Loss Of Power On July 15, 2025, at about 1440 Pacific daylight time, an experimenta>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Linx (08.07.25)

Aero Linx: Soaring Safety Foundation (SSF) The Soaring Safety Foundation (SSF) is the Training and Safety arm of the Soaring Society of America (SSA). Our mission is to provide ins>[...]

Aero-News: Quote of the Day (08.07.25)

“NBAA and UAS operators commend the FAA for issuing this proposed rulemaking, which will unlock new capabilities and commercial opportunities for many organizations. While st>[...]

ANN's Daily Aero-Term (08.07.25): No Gyro Approach

No Gyro Approach A radar approach/vector provided in case of a malfunctioning gyro-compass or directional gyro. Instead of providing the pilot with headings to be flown, the contro>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC