Private Group Envisions Manned Lunar Missions | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.14.25

Airborne-NextGen-07.15.25

AirborneUnlimited-07.16.25

Airborne-FlightTraining-07.17.25

AirborneUnlimited-07.18.25

Fri, Oct 18, 2013

Private Group Envisions Manned Lunar Missions

Rima Marius Sees Ongoing Human Presence On The Moon

A private group founded by entrepreneur Joel Ammons says it just does not want to send humans back to the Moon, "we want to go and then keep going, again and again and again."

The company is Rima Marius, which says in its website that it is named for the region of the Moon that is its objective. The company says it was formed as a for-profit entity "focused on developing both technically and financially sustainable systems that will not only provide for an initial exploration of the Marius Hills region, but a continuing, comprehensive exploration program."

Rima Marius says the project is vast in its scope, allowing for the use of both existing and near-term technologies to ensure success. Such technologies as 3D Printing already exist, and will be used for the construction of a moon habitat. Several trips will have to be performed to establish the project on the lunar surface, and make ready for the crewed follow-up mission.

The company says on its website that the expedition requires two spacecraft, launched approximately 4 months apart:

  • A Lunar Surface Vehicle (LSV), which would be the first vehicle dispatched to the moon and would be injected into a 90-day Weak Stability Boundary (WSB) transfer. This vehicle will deliver the housing components to be constructed for the astronauts to use for the duration of their surface stay; and
  • A Lunar Transfer Vehicle (LTV), which will carry the crew to and from the lunar surface on 3-day transfers.

Each of these spacecraft is launched and assembled in components, delivered separately to low-Earth orbit using SpaceX Falcon Heavy launch vehicles. For the LSV, the first launch delivers a lunar lander/descent stage and the housing construction components to be stocked with enough supplies and provisions to support two 4-person expeditions for 150 days each.

The crewed mission is scheduled to last 75-days, and will include exploration of lunar "Lava Tubes", and the Marius "Pit", a deep hole that may be the entry point into a collapsed lava tube. This target may be a suitable area for a long-term moon base. The cost of the mission could equal $2.5 billion, and will be raised through efforts like the newly created STAR Fund for private investors, and also through crowd-funding.

(Mission plan image provided by Rima Marius)

FMI: www.rimamarius.com

Advertisement

More News

Airborne 07.18.25: Will MOSAIC Be Announced Tuesday???, 12 Hot News Items

Also: DeltaHawk, Piper, Hartzell, High Flying Models & Bob Hoover Legacy, SUN n FUN26 and Affordable Flying Expo 2025 -- and MUCH More. In an exclusive interview earlier this m>[...]

Airborne-Flight Training 07.10.25: ATC School, Air Race Classic, Samson School

Also: Sully v Bedford, Embraer Scholarships, NORAD Intercepts 11, GAMA Thankful Middle Georgia State University will be joining the Federal Aviation Administration’s fight ag>[...]

Airborne 07.18.25: Will MOSAIC Be Announced Tuesday???, 12 Hot News Items

Also: DeltaHawk, Piper, Hartzell, High Flying Models & Bob Hoover Legacy, SUN n FUN26 and Affordable Flying Expo 2025 -- and MUCH More. In an exclusive interview earlier this m>[...]

ANN's Daily Aero-Linx (07.16.25)

Aero Linx: Minnesota Seaplane Pilots Association (MSPA) We are the Minnesota Seaplane Pilots Association (MSPA), a nonprofit organization dedicated to supporting and empowering sea>[...]

ANN's Daily Aero-Term (07.16.25): Preferred IFR Routes

Preferred IFR Routes Routes established between busier airports to increase system efficiency and capacity. They normally extend through one or more ARTCC areas and are designed to>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC