A350 XWB MSN001 Conducts 'Maximum Energy Rejected Take-Off' Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Thu, Jul 24, 2014

A350 XWB MSN001 Conducts 'Maximum Energy Rejected Take-Off' Test

One Of The Mandatory Tests For Certification Completed Successfully

Airbus has successfully performed the ‘Maximum Energy Rejected Take-Off’ (MERTO) test with the A350 MSN001 on the morning of Saturday 19th July at Istres Air Force Base in France. MERTO, which follows on from the previous ‘High Energy Rejected Take-Off’ (HERTO) preparation test conducted by MSN001 two months ago, is a part of the mandatory series of tests for certification.

This latest test is to confirm the braking system’s ability to safely stop the aircraft following a rejected take-off at high speed and high weight – using a set of worn-out brakes. As these brakes absorb the kinetic energy of the aircraft, they glow bright orange and reach a temperature of around 1,400 degrees centigrade by the time the aircraft has safely come to a standstill, whereupon the tires are deflated by special fuses. According to certification requirements, the aircraft then has to stay put for five minutes unassisted, after which firefighters are allowed to spray the wheels and brakes to cool them. The Airbus Test team received full support from the “DGA (Délégation Générale pour l’Armement) – Essais en vols”, which played a key role in facilitating the test.

MERTO is the A350 XWB program’s final major test before MSN005, one of two cabin-equipped development aircraft, embarks on ‘Route Proving’ in July. The programme has to date achieved more than 2,250 flight hours in around 540 flights, and is on track for certification in Q3 and first delivery to Qatar Airways in Q4.

(Image provided by Airbus)

FMI: www.airbus.com

Advertisement

More News

Aero-News: Quote of the Day (05.25.25)

“Each Honor Flight mission is a special occasion, but the ability to be a part of EAA AirVenture always creates unforgettable moments. Honoring our local Vietnam veterans out>[...]

Classic Aero-TV: Efficient Versatility -- NASA GL-10 Greased Lightning

From 2015 (YouTube Edition): The Airframes Displayed At AUVSI 2015 Were Quite Innovative It’s common to visualize a small vertical lift UAV as having 4 to 6 propellers, it&rs>[...]

NTSB Prelim: Cessna 525

The Airplane Began A Descent While Still In A Right Turn And Impacted Terrain On March 13, 2025, about 0733 central daylight time, a Cessna 525A airplane, N525CZ, was destroyed whe>[...]

Klyde Morris (05.23.25)

It Looks Like It's Gonna Get A Bit Tight, Klyde FMI: www.klydemorris.com>[...]

Airborne-NextGen 05.20.25: Drone Regs, Zero-Emission Cargo, Door-Dash Drone

Also: Blackhawk’s Replacement, Supersonic Flight, Archer 1Q/25, Long-Range VTOL Program U.S. Secretary of Transportation Sean P. Duffy released an update on progress being ma>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC