AD: Saab AB, Saab Aeronautics Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Fri, Sep 14, 2018

AD: Saab AB, Saab Aeronautics Airplanes

AD NUMBER: 2018-18-17

PRODUCT: Certain Saab AB, Saab Aeronautics Model 340A (SAAB/SF340A) and SAAB 340B airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2016-13-06, which applied to the airplanes listed above.

AD 2016-13-06 required a revision of the applicable airplane flight manual (AFM), repetitive inspections of the horizontal stabilizer de-icing boots, and applicable corrective actions. This AD continues to require a revision of the applicable AFM, repetitive inspections of the horizontal stabilizer de-icing boots, and applicable corrective actions.

This AD also requires replacement of single stitched de- icing boots with improved double stitched boots, and re-identification of the modified horizontal stabilizer leading edge.

This AD was prompted by reports of ruptured horizontal stabilizer de-icing boots.

DATES: This AD is effective October 18, 2018.

COST: The FAA estimates estimate that this AD affects 51 airplanes of U.S. registry.  

The actions required by AD 2016-13-06, and retained in this AD take about 6 work-hours per product, at an average labor rate of $85 per workhour. Based on these figures, the estimated cost of the actions that are required by AD 2016-13-06 is $510 per product.

In addition:

  • The FAA estimates that any necessary follow-on actions required by AD 2016-13-06, and retained in this AD take about 6 work-hours and require parts costing $9,500, for a cost of $10,010 per product. There is no way for the FAA to determine the number of aircraft that might need these actions.
  • The FAA also estimate that it would take about 6 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour. Required parts would cost about $13,500 per product. Based on these figures, the estimated the cost of this AD on U.S. operators to be $714,510, or $14,010 per product.
FMI: AD

Advertisement

More News

ANN Thanks Our Speedy Sponsor... Blackshape!!!

Check out Blackshape in Oshkosh Display #190 Situated in the Apulian Aerospace district in Monopoli, Italy, Blackshape embodies the epitome of Italian craftsmanship, style, and qua>[...]

Alpha Systems AOA Guides ANN Oshkosh Coverage

A Powerhouse In Aviation Safety Technology, Visit Alpha Systems AOA at Osh Display#3124-3125 Alpha systems AOA has been developing and integrating Angle of Attack systems for the l>[...]

NTSB Final Report: Boeing CH-46E

Pilot Noticed That The No. 2 Engine Torque Indicator Was “Maxed Out” And The No. 1 Torque Indicator Was About 60% Analysis: The pilot in command (PIC) reported that the>[...]

ANN's Daily Aero-Term (07.24.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (07.24.25)

Aero Linx: HeliOffshore HeliOffshore is the global, safety-focused association for the offshore helicopter industry. Our mission is to lead a collective safety conversation, identi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC