Another Delay? Dreamliner Delivery May Push To 2011 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-03.10.25

Airborne-NextGen-03.11.25

Airborne-Unlimited-03.12.25

Airborne-AffordableFlyers-03.13.25

Airborne-Unlimited-03.14.25

Tune in to www.airborne-live.net to watch our exclusive coverage of AEA 2025!
March 18 - Opening Session & New Product Introductions from 0830--1200 PDT
March 19 - First Day of LIVE interviews from the show floor: 1400--1630 PDT, 
March 20 - Day 2 of LIVE Interviews from the show floor: 1100--1400 PDT

Sat, Jul 17, 2010

Another Delay? Dreamliner Delivery May Push To 2011

Boeing Says IF It Happens, It Would Only Be "A Few Weeks" Into The New Year

The head of Boeing's 787 program said in a Friday conference call with reporters that, while the company still plans to get the Dreamliner to their launch customer late in 2010, the delivery could slip "a few weeks" into 2011.

Scott Fancher said ANA, which is scheduled to get the first of the new airliners, is being kept in the loop on the delivery schedule. The Chicago Tribune reports that Fancher said the potential delay is due in part to inspections and fixes necessary to address several production issues in planes that have already been built. Fancher did say that the most recent problem, which was discovered in the horizontal stabilizer, has been resolved, and all five Dreamliners in the test program are again flying.

Fancher said the flight test program was going somewhat slower than anticipated because each airplane has to be fitted with new test instruments as the program proceeds, which is taking longer than planned. But he said the design of the Dreamliner is not among the issues that could delay the delivery.

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Dennis T Kirby/Michael B Kirby Murphy Rebel

(Pilot) Reported That During The Takeoff Roll, The Flight Controls “Felt Funny” Analysis: The pilot reported that he had a “controllability issue” during ta>[...]

ANN's Daily Aero-Linx (03.20.25)

Aero Linx: LightHawk We know that aviation can greatly enhance the rate and effectiveness of conservation work, often in ways that are not immediately obvious. We also know that av>[...]

ANN's Daily Aero-Term (03.20.25): Designated Common Traffic Advisory Frequency

Designated Common Traffic Advisory Frequency (CTAF) Area In Alaska, in addition to being designated for the purpose of carrying out airport advisory practices while operating to or>[...]

Airborne 03.12.25: Xyla Foxlin v FAA, RHC's New R88, Hemisphere Dancer Returns

Also: Electric Helicopter Engine, Spitfire Report, Nat'l Aeronca Convention, Skydiver Manual Xyla Foxlin is a social media personality who is an accomplished electronic engineer wh>[...]

ANN's Daily Aero-Linx (03.21.25)

Aero Linx: Wright Flight, Inc. Wright Flight, Inc., named after the Wright Brothers, is a unique program that began in Tucson in 1986. Wright Flight was founded by Lt. Col. Robin S>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC