AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.27.25

AirborneNextGen-
10.28.25

Airborne-Unlimited-10.29.25

Airborne-Unlimited-10.30.25

AirborneUnlimited-10.17.25

Mon, Oct 29, 2018

AD: The Boeing Company Airplanes

AD NUMBER: 2018-22-04

PRODUCT: Certain Boeing Model 787-8 and 787-9 airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2017-01-02, which applied to the airplanes listed above.

AD 2017-01-02 required an inspection for discrepant inboard and outboard trailing edge flap rotary actuators, and replacing the rotary actuator or doing related investigative and corrective actions if necessary.

This AD continues to retain those actions. This AD also adds airplanes to the applicability and reduces the number of affected actuators.

This AD was prompted by a report indicating that some inboard and outboard trailing edge flap rotary actuators may have been assembled with an incorrect no-back brake rotorstator stack sequence during manufacturing.

DATES: This AD is effective November 28, 2018.

COST: The FAA estimates that this AD affects 89 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Inspection 5 work-hours × $85 per hour = $425.
  • On-Condition Costs
  • Check to determine flight cycles on the rotary actuator 1 work-hour × $85 per rotary actuator.
  • Functional Test per rotary actuator 2 work-hours × $85 per hour = $170 per rotary actuator.
  • Replacement per rotary actuator 2 work-hours × $85 per hour = $170 per rotary actuator.
  • System Test after rotary actuator replacement(s) per airplane 24 work-hours × $85 per hour = $2,040  per airplane.
FMI: AD

Advertisement

More News

Klyde Morris (10.27.25)

It Does Indeed Work Every Time, Klyde FMI: www.klydemorris.com>[...]

Airborne 10.27.25: MOSAIC Phase 1, Katana Returns, MOSAIC Town Hall!

Also: Orlando Air Show Cancelled, ATC Staffing Shortages, CH-47F Block II Chinooks, Sustainable $$ More than a decade of hard work, legal setbacks, and community advocacy has final>[...]

Airborne-NextGen 10.28.25: Police Drones, Nat'l Parks v UAVs, MOSAIC Phase 1

Also: MOSAIC Town Hall, Lockheed Martin Venus, Electric Aircraft Cooling, Korea Taps Archer The Miami-Dade Sheriff’s Office is at the front end of a year-long AI policing exp>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

NTSB Final Report: Airbus A321-271N (A1); Cessna 172N (A2)

The Local Controller’s Poor Judgment In Prioritization Of Their Ground Traffic Ahead Of Their Airborne Traffic Analysis: Hawaiian Airlines flight 70 (HAL70), N2165HA, an Airb>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC