That Was A Little Short | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Tue, Jul 06, 2004

That Was A Little Short

Abbreviated Burn Leaves Satellite In Too-Low Orbit

The Sea Launch team is gathering and reviewing Telstar 18 mission data to understand the sequence of events that led to a premature shutdown of the Sea Launch Zenit-3SL upper stage during that mission earlier this week.

The Zenit-3SL launch vehicle lifted off from the equatorial launch site on June 28 at 8:59 pm PDT, (3:59 GMT, June 29) as scheduled, deploying Loral's Telstar 18 communications satellite into orbit with a separated mass of 4,640 kg (10,229 lbs.). Based on preliminary flight data, all Sea Launch system flight parameters were nominal except that the upper stage of the launch vehicle shut down about 54 seconds prematurely, following the second of two planned burns of the upper stage. The early shutdown caused the satellite to be released into an orbit with an apogee of 21,605 km, some 14,000 km short of the 35,786 km target apogee.

Space Systems/Loral confirmed spacecraft signal acquisition by a ground station in Perth, Australia, soon after separation and reported that the satellite was operating normally. Loral Space & Communications has replanned the mission and, if successful, the satellite has sufficient on-board fuel to bring it to its final orbital position and meet or exceed its 13-year specified life. Loral also reported the Telstar 18 spacecraft has deployed its solar arrays and all systems on the spacecraft are functioning as designed.

The cause of the rocket's upper stage premature shutdown is under investigation by an Energia-appointed commission. Sea Launch will also form an independent review board to evaluate all findings and confirm that any corrective actions associated with the upper stage performance on the Telstar 18 mission are complete, satisfactory and verified. At this point in time, Sea Launch is optimistic it will conclude the board's investigation and complete two more launches this year, as originally planned. Sea Launch remains highly confident in the robust capability of the Zenit-3SL system, including the upper stage. This component remains one of the premiere upper stages in the industry, with an overall success rate of approximately 97%.

FMI: www.sea-launch.com

Advertisement

More News

OSH25 Day Four Redux: Spirit SE-1!, H55 eFlyer, King Schools

Also: Centauri Aircraft Valkyrie, Meet the Admin, Night Airshow, Pelton Intv'w When we laid eyes on this critter, we fell in love… and then we learned the amazing story of t>[...]

ANN Thanks Our Speedy Sponsor... Blackshape!!!

Check out Blackshape in Oshkosh Display #190 Situated in the Apulian Aerospace district in Monopoli, Italy, Blackshape embodies the epitome of Italian craftsmanship, style, and qua>[...]

Alpha Systems AOA Guides ANN Oshkosh Coverage

A Powerhouse In Aviation Safety Technology, Visit Alpha Systems AOA at Osh Display#3124-3125 Alpha systems AOA has been developing and integrating Angle of Attack systems for the l>[...]

Pilot Mall Intro's High Flying Models To ANN Sponsor Lineup

High-Flying Models By PilotMall.com: Honoring Aviation's Legacy We are dedicated to preserving and celebrating our rich aviation heritage through stunning mahogany wood scale repli>[...]

CiES Fuels ANN's Oshkosh 2025 Special Event Coverage

CiES Has Pioneered Life Saving Technology Of Use To Pilots All Over The World... Booth 3119 CiES: CiES Inc. is the global leader in digital fuel quantity sensors for general aviati>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC