Another Day, Another Quality Issue on 787 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.09.25

Airborne-NextGen-06.10.25

AirborneUnlimited-06.04.25

Airborne-AffordableFlyers-06.05.25

AirborneUnlimited-06.06.25

Mon, Jun 12, 2023

Another Day, Another Quality Issue on 787

Supplier's Part Out of Spec, Exceeding Tolerances in Horizontal Stabilizer Assembly

The Dreamliner will see delays once again after Boeing discovered another manufacturing SNAFU inside the 787's construction.

The company said that it was inspecting all 787s in inventory in search of "a nonconforming condition related to a fitting on the horizontal stabilizer. The inspections and required rework will affect the timing of near-term 787 deliveries."

The issue is just the latest in a long line of quality woes encountered in the 787's troubled manufacturing history. The novel, liberal use of next-gen materials and lightweight composites have taken Boeing on a bit of a learning journey throughout the Dreamliner's production run, and recent issues continue that burgeoning tradition. 

The affected part is a fitting that joins the horizontal stabilizer, sized incorrectly by a supplier. The pieces, when installed, were found to have created a gap greater than allowed in the blueprints, which are limited to a few thousandths of an inch on paper. Repairs will end up taking some time, along with going over Dreamliners in inventory to ensure nothing similar occurred with them, too. The horizontal stab issue is separate from a recent problem with the vertical one, uncovered in April. In that case, the issue was blamed on a 'nonstandard' procedure, and affected a handful of fittings that attached the tail to the fuselage. That fix alone has added months to Dreamliner delivery schedules, making customers wonder just how long they'll have to wait to get the next batch. 

FMI: www.boeing.com

Advertisement

More News

Airborne 06.04.25: G100UL Legal Decision, FAA v Starship, Laser Conviction

Also: AV-8B Harrier For CAF Arizona, Boeing Gets ODA, Army NG Rescue, Longitude To C. America A California Superior Court judge recently ruled that GAMI’s unleaded avgas does>[...]

ANN's Daily Aero-Term (06.09.25): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

ANN's Daily Aero-Linx (06.09.25)

Aero Linx: T-6A Texan II The T-6A Texan II is a single-engine, two-seat primary trainer designed to train Joint Primary Pilot Training, or JPPT, students in basic flying skills com>[...]

NTSB Final Report: Evektor Aerotechnik EV97

At The Time Of The Accident The Wind Was 140° At 11 Knots, Gusting To 19 Knots Analysis: According to the pilot, she was on a multi-day cross-country flight in the experimental>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC