Van's Issues RV-12 Service Bulletin | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Feb 28, 2022

Van's Issues RV-12 Service Bulletin

Required Fix to Strengthen Rear Tailcone Skins

Van's has issued a service bulletin for RV-12 and RV-12iS aircraft, specifically requiring owners to inspect the lower portion of the tailcone for cracks, and install stiffening equipment to bolster them should damage be found. 

Van's issued the warning after receiving reports of cracking along the lower tailcone skins of RV-12 near the tail bulkheads, observed along the centerline of the plane. Even if cracking is not evident, owners are required to install the support clips. If damage is uncovered, then an additional patch plate will need to be fabricated and installed all at once. Depending on the level of cracking present, the fix may require additional patchwork past the damaged piece, as the bulletin requires that "the patch should capture at least 3 rivets past the crack in the skin or forward and aft of the bulkhead and 2 rivets left and right of centerline." For the average experienced builder or A&P, Vans estimates the job will take just under 2 and 1/2 hours. Those completing the patch plate installation should be ready to clip to the bulkhead below. Home builders should be ready to use a tail stand to prevent the rear of the aircraft from striking the ground while work is performed.

 Accessing the deeper portion of the tailcone bulkhead will require additional, temporary plywood reinforcement to protect the skin between each rib during the install. Owners at least have a while to comply, with the work required "Within 100 hours or at the next 12-month inspection, whichever occurs first." For the full bulletin and step by step directions, see the Van's website below.

FMI: www.vansaircraft.com

Advertisement

More News

ANN's Daily Aero-Linx (11.25.25)

Aero Linx: Vintage Sailplane Association The purpose of the Vintage Sailplane Association (VSA) is to promote the acquisition, restoration and flying of vintage sailplanes by its m>[...]

NTSB Final Report: Glasair GlaStar

Smoke Began Entering The Cockpit During The Landing Flare, And Then The Pilot Noticed Flames... Analysis: The pilot reported that about 30 minutes into the local flight, he heard s>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Red Tail Project Update – Taking the Mission to the People

From 2010 (YouTube Edition): The Red Tail Project Continues Effort Towards ‘Rise Above Program’ The Red Tail Project is a true example of this unbreakable spirit. In 20>[...]

Airborne 11.24.25: ANN's 30th!, Starship’s V3 Booster Boom, Earhart Records

Also: 1st-Ever Space Crime Was a Fraud, IAE Buys Diamonds, Kennon Bows Out, Perseverance Rover An interesting moment came about this past Sunday as ANN CEO, Jim Campbell, noted tha>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC