NASA 'Endeavours' To Solve Air Leak Problem | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.12.25

Airborne-NextGen-05.13.25

AirborneUnlimited-05.14.25

Airborne-FlightTraining-05.15.25

AirborneUnlimited-05.16.25

Thu, Aug 02, 2007

NASA 'Endeavours' To Solve Air Leak Problem

Launch Remains On Schedule For August 7... For Now

NASA engineers managed to make some headway Wednesday in tracking down a stubborn air leak inside the shuttle Endeavour's crew compartment. The leak has been traced to one of two positive pressure-relief valves, which ensure that the crew cabin does not become over-pressurized.

As ANN reported this week, workers plan to remove and replace the suspect valve -- located behind a wall, near the orbiter's lavatory compartment -- using a valve from Atlantis. Work was scheduled to begin Wednesday night, and be completed Thursday.

Assuming all goes to plan, that should give NASA enough time to test the replacement valve, and verify the orbiter is airtight in time for the shuttle's planned liftoff next Tuesday, reports The Associated Press.

Also causing engineers some grief Wednesday was one of two thermostats inside an auxiliary power unit onboard the shuttle. After briefly pondering whether to swap out both thermostats -- another costly move, time-wise -- NASA determined the faulty sensor is good enough fly as-is, due in part to redundancy built into the system.

Alas, mechanical troubles aren't the only ones plaguing NASA this week -- the weather is also giving the agency fits. Thunderstorms around Kennedy Space Center have already delayed work on Endeavour, and forced a 24-hour postponement with the launch of the space agency's Mars Phoenix Lander.

For the moment, Phoenix is set to liftoff Saturday morning... giving NASA the necessary 48-hour turnaround time needed to launch Endeavour on schedule.

Should Phoenix get bumped once again, it would have priority over Endeavour on the launch schedule -- as the launch window to Mars closes in three weeks, and a new one doesn't open for two years.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.16.25)

Aero Linx: International Federation of Air Traffic Controllers' Associations (IFATCA) IFATCA is the recognised international organisation representing air traffic controller associ>[...]

Aero-News: Quote of the Day (05.16.25)

“The BlackBird is more than a demonstrator—it’s a flying testbed for the future of aviation. To see it take flight in such a short time is a testament to our team>[...]

ANN's Daily Aero-Term (05.16.25): Glideslope Intercept Altitude

Glideslope Intercept Altitude The published minimum altitude to intercept the glideslope in the intermediate segment of an instrument approach. Government charts use the lightning >[...]

Airborne-NextGen 05.13.25: Merlin Tests, Dronetag Accuses, Flying Car?

Also: MQ-9B UAS MTC, FlightSimExpo, New JPL Director, Japanese Lunar Lander Preps Merlin’s flight testing campaign continues to rapidly progress with its certification-ready >[...]

Classic Aero-TV: Jabiru's New J170-D - An Upgraded and Fine-tuned LSA

From 2017 (YouTube Edition): The Airplane From Down Under Is A Proven Trainer… Jabiru was one of the early light sport aircraft (LSA) brought into the U.S.A. when the sport >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC