Astronauts Add A Little Harmony To The ISS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Oct 26, 2007

Astronauts Add A Little Harmony To The ISS

Work Gets Underway On Construction-Intensive STS-120

NASA reports STS-120 Mission Specialists Scott Parazynski and Doug Wheelock wrapped up the first of five planned spacewalks Friday afternoon. During the six-hour, 14-minute excursion, the STS-120 and Expedition 16 crews successfully installed the Harmony module in a temporary location on the International Space Station, and prepared the P6 truss for its relocation.

The Italian-made Harmony module weights almost 16 tons, and when permanently installed will add over 2,500 cubic feet of habitation space to the ISS. It will also serve as the docking node for Japanese and European laboratories, scheduled for delivery over the next three shuttle missions.

The first spacewalk of STS-120 began at 0602 -- about a half-hour ahead of schedule, reports The Associated Press, all the better to briefly enjoy the view.

"You're not going to believe this," Parazynski told Wheelock as he opened the hatch, as they 122 nautical miles above the Andes and the Amazon rain forest of South America.

Mission Specialist Paolo Nespoli coordinated spacewalk activities. Mission Specialists Stephanie Wilson and Clay Anderson and Expedition 16 Flight Engineer Daniel Tani were at the controls of the station’s Canadian-built robotic arm.

Parazynski and Wheelock removed and stowed the S-band Antenna Structural Assembly which is being returned to Earth on Discovery. Next, they secured a Payload and Data Grapple Fixture onto Harmony that could not be in place during launch, removed contamination covers and disconnected the power cables linking Harmony to Discovery.

When the spacewalkers’ preparations were complete, the station robotic arm operators removed Harmony from the payload bay and moved it to its position on Unity. Meanwhile, the spacewalkers prepared the P6 truss for its relocation.

The two spacewalkers returned to the station at 1216 EDT. Four more spacewalks are scheduled for STS-120.

FMI: www.nasa.gov

Advertisement

More News

Classic Aero-TV: Mayman Aerospace Speeder Dazzles Oshkosh Crowds

From 2023 (YouTube Edition): A Moniker Well-Chosen Founded in 2021 by serial entrepreneur David Mayman and headquartered in New York City, Mayman Aerospace is the designer and manu>[...]

NTSB Prelim: Socata TBM 700

The Controller Provided The Pilot With A Low Altitude Alert And The Altimeter Setting That Was Current At The Time On October 13, 2025, at about 0815 eastern daylight time, a Socat>[...]

ANN's Daily Aero-Term (11.11.25): Outer Marker

Outer Marker A marker beacon at or near the glideslope intercept altitude of an ILS approach. It is keyed to transmit two dashes per second on a 400 Hz tone, which is received aura>[...]

ANN's Daily Aero-Linx (11.11.25)

Aero Linx: Seaplane Pilots Association The Seaplane Pilots Association is the only organization in the world solely focused on representing the interests of seaplane pilots, owners>[...]

Aero-News: Quote of the Day (11.11.25)

“While business aviation is fully included in the FAA’s traffic reductions, we know that our sector will continue to pursue mandatory and voluntary means to ensure we a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC