USAF Awards Additional C-130 Modernization And Training Contracts To Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Jun 06, 2011

USAF Awards Additional C-130 Modernization And Training Contracts To Boeing

C-130 AMP Low-Rate Initial Production Continues Successfully

The U.S. Air Force has awarded a contract worth $61 million to Boeing for two more C-130 Avionics Modernization Program (AMP) kits and two Aircrew Training System devices as part of a low-rate initial production (LRIP) contract that was first granted in 2010.

"We look forward to adding more aircraft to our line over the next two years," said Tommy Jackson, C-130 AMP deputy program manager for the U.S. Air Force. "Our team at Warner Robins Air Force Base is modifying the cockpits of two C-130 aircraft that were inducted in late 2010 and expect to have them completed this year."

Boeing is building two new C-130 AMP Aircrew Training System devices: a Weapon System Trainer and an Avionics Part Task Trainer. The training devices will be developed at supplier CAE USA's Tampa, FL, facility and delivered to the Arkansas Air National Guard C-130 AMP training center at Little Rock Air Force Base, AR, in 2014.

The contract announced Friday is the second Air Force agreement in three months that approves the purchase of more AMP kits for the C-130 Hercules. In December, an Acquisition Decision Memorandum authorized the LRIP program to increase from 20 to 26 aircraft. A total of six AMP kits have been approved for purchase and the two at Warner Robins, GA, are the first to be installed. The third C-130 scheduled for LRIP will be inducted in late 2011 and the fourth in early 2012.

"Low-rate initial production is moving forward as planned," said Mahesh Reddy, C-130 AMP program director for Boeing. "We are on a deliberate path toward full rate production and a safer and more cost-effective solution for the warfighter."

FMI: www.af.mil, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (12.03.25)

Aero Linx: American Aviation Historical Society AAHS is dedicated to the preservation and dissemination of the rich heritage of American aviation. Our purpose is to collect, preser>[...]

ANN's Daily Aero-Term (12.03.25): CrewMember (UAS)

CrewMember (UAS) A person assigned to perform an operational duty. A UAS crewmember includes the remote pilot in command, the person manipulating the controls, and visual observers>[...]

NTSB Prelim: Maule M-7-235A

Immediately After The Right Main Tire Contacted The Runway Surface, The Right Main Landing Gear Failed On October 31, 2025, at about 1227 Pacific daylight time, a Maule M-7-235A, N>[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

Aero-News: Quote of the Day (12.04.25)

"On December 3, 2025, at approximately 10:45 a.m., a Thunderbird pilot ejected safely from a F-16C Fighting Falcon aircraft during a training mission over controlled airspace in Ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC