FAA Grants NATA Requested Extension on Crewmember Relief | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Mon, Jun 01, 2020

FAA Grants NATA Requested Extension on Crewmember Relief

Two Exemptions Are Available To All Part 119 Certificated Carriers Operating Under Part 135

The FAA has granted a NATA request for an extension to exemptions regarding certain crew training and checking requirements.

The two exemptions, available to all Part 119 certificated carriers operating under Part 135, were initially granted to NATA in late March, with  Exemption No. 18509 A extended until 07/31/2020 and Exemption No. 18510 A extended until 10/31/2020. Operators that submitted a Letter of Intent prior to May 29, 2020, in accordance with the original issuance of this exemption have met the requirement of Condition and Limitation No. 1 and do not have to submit another letter. Also, operators will be required to update the safety risk assessment or safety analysis and corresponding risk mitigations. Every Part 135 operator should obtain and carefully review these exemptions.

 

Exemption No. 18509A

Regulations addressed: §§ 135.293(b), 135.295(e) and (g), 135.297(c)(1)(i) and (ii), 135.331(c)(3), (5), and (7), 135.347(a), and 135.351(b)(2) and (c) Provides alternative methods to conduct certain required crewmember emergency procedures during recurrent and upgrade training, testing, and checking.

 

Exemption No. 18510A

Regulations addressed: §§ 135.245(c), 135.247(a), 135.301(a), 135.323(b), 135.337(g), 135.338(g), 135.339(b), 135.340(b), and 135.505(d)

The exemptions provide additional time for completion of recurrent training and qualification activities of up to three calendar months after the month that the activity was due to have been completed. As an example, the inclusion of training due through July 31, 2020 means that, for a crewmember who was due to complete recurrent training in July as to a requirement that already allowed for one grace month, the original grace month is August. With this two-month extension, the crewmember’s grace months are August, September, and October. If the crewmember completes the training in August-October, the crewmember will be considered to have completed it in July.

"NATA’s continued engagement with the FAA is crucial as restrictions are lifted and the country begins a gradual return to operations. We are grateful the FAA understands the needs of the industry in ensuring access to air transportation remains available and the timeline required to address the currency matters of operators,” stated NATA Vice President of Regulatory Affairs John McGraw.

FMI: www.nata.aero/advocacy/coronavirus

Advertisement

More News

Airborne 05.19.25: Kolb v Tornados, Philippine Mars, Blackhawk Antler Theft

Also: Tentative AirVenture Airshow Lineup, Supersonic Flight Regs, Private Pilot Oral Exam Guide, Boeing Deal The sport aircraft business can be a tough one... especially when Moth>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Term (05.23.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

Aero-News: Quote of the Day (05.23.25)

“While we are relieved that no one was injured, the destruction of our aircraft will have severe consequences on our operations, and it is a personal blow to our dedicated te>[...]

ANN's Daily Aero-Linx (05.23.25)

Aero Linx: Ercoupe Owners Club We fly an airplane that was the peak of pre-World War II development. It took more than a decade and a half before the features of the Ercoupe were t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC