It's A Successful First Flight For AH-64D Apache Block III Test Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Dec 08, 2009

It's A Successful First Flight For AH-64D Apache Block III Test Aircraft

Increased Use Of Composites And New Engines In Block III Aircraft

The Boeing AH-64D Apache Block III program has completed the first flight of its structures test aircraft. The test, conducted Nov. 23 in Mesa, demonstrated flight characteristics and handling maneuvers. Tests to continue to expand the helicopter's flight envelope are expected to continue for the next several weeks.

Block III technologies being tested include the composite main rotor blade, composite horizontal stabilator, and -701D engines, which include an enhanced digital electronic control unit. The aircraft also features a split-torque face gear transmission that increases power throughput by more than 20 percent within the same physical operating space as the legacy transmission.

"This flight demonstration is another crucial step as the U.S. Army and Boeing work together to meet the objectives of the Apache Block III program," said Col. Shane Openshaw, Army Apache project manager. "The Apache Block III helicopter meets the Army's requirement to sustain the aircraft for its life cycle while providing superior capabilities to Army aviators, battlefield commanders and soldiers."

The program's avionics test aircraft, which made its first flight ahead of schedule in June 2008, completed the Army's Limited User Test according to schedule, in November, at the Yuma, AZ Proving Ground.

"Meeting calendar objectives while integrating new capabilities confirms the maturity of the multiple technologies conceived, designed and developed by Boeing and our key partners for the Apache Block III helicopter," said Al Winn, Boeing Apache Programs vice president. "Our success highlights the value of cooperative development."

The Army and Boeing continue to work toward an anticipated Department of Defense acquisition process Milestone C decision in April 2010.

FMI: www.boeing.com

Advertisement

More News

Classic Aero-TV: Mayman Aerospace Speeder Dazzles Oshkosh Crowds

From 2023 (YouTube Edition): A Moniker Well-Chosen Founded in 2021 by serial entrepreneur David Mayman and headquartered in New York City, Mayman Aerospace is the designer and manu>[...]

NTSB Prelim: Socata TBM 700

The Controller Provided The Pilot With A Low Altitude Alert And The Altimeter Setting That Was Current At The Time On October 13, 2025, at about 0815 eastern daylight time, a Socat>[...]

ANN's Daily Aero-Term (11.11.25): Outer Marker

Outer Marker A marker beacon at or near the glideslope intercept altitude of an ILS approach. It is keyed to transmit two dashes per second on a 400 Hz tone, which is received aura>[...]

ANN's Daily Aero-Linx (11.11.25)

Aero Linx: Seaplane Pilots Association The Seaplane Pilots Association is the only organization in the world solely focused on representing the interests of seaplane pilots, owners>[...]

Aero-News: Quote of the Day (11.11.25)

“While business aviation is fully included in the FAA’s traffic reductions, we know that our sector will continue to pursue mandatory and voluntary means to ensure we a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC