Elements For The First A350 XWB Horizontal Tail Begin To Take Shape | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Aug 02, 2011

Elements For The First A350 XWB Horizontal Tail Begin To Take Shape

Finished Elements Will Be Shipped To Toulouse, France For Final Assembly

Production on a key component in the A350 XWB’s initial horizontal tail plane has begun, marking a new industrial milestone for Airbus’ new-generation widebody jetliner family. This activity is being performed at Airbus’ centre of excellence in Puerto Real, Spain, and involves build-up of the horizontal tail plane’s lateral box in a combined effort with primary partner company Aernova.

Measuring some 30 feet long and from 4.5 and about 13 feet wide, the A350 XWB horizontal tail plane’s lateral box is composed primarily of carbon fibre – with its few metal components made of titanium alloys and aluminium.

After assembly is complete, the lateral boxes will be sent to Airbus’ facility in Getafe, Spain – where production of additional A350 XWB components is underway – for joining with the elevators and completion of the horizontal tail plane. The finished element then is to be transferred to the jetliner’s final assembly line in Toulouse, France. 

Airbus’ Puerto Real facility is used for the automated assembly of movable surfaces, final equipment processes and delivery of large structural components to the final assembly line in Toulouse. Its own assembly capabilities consist of a mobile line spread across five interlinked stations: main structure and trailing edge assembly; structural assembly of lateral boxes; automated drilling and riveting; trailing edge equipment; and final operations.

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (11.29.25): Waypoint

Waypoint A predetermined geographical position used for route/instrument approach definition, progress reports, published VFR routes, visual reporting points or points for transiti>[...]

ANN's Daily Aero-Linx (11.29.25)

Aero Linx: Sentimental Journey to Cub Haven Sentimental Journey Flyin began in 1986 with a group of dedicated volunteers working to provide a sentimental return to Lock Haven, the >[...]

NTSB Prelim: Jabiru USA Sport Aircraft LLC J230-SP

The Pilot Would Often Fly Over Their House At A Low Altitude And That Family Members Would Go Outside To Wave On November 14, 2025, at 1708 eastern standard time, a Jabiru USA Spor>[...]

Classic Aero-TV: Crafting The Future of eVTOL Infrastructure

From 2024 (YouTube Edition): Volatus Infrastructure Paves The Way The name “Volatus” seems to be everywhere these days, popping up in a series of partnerships and proje>[...]

Klyde Morris (11.28.25)

Fortnite Conquers All, Klyde FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC