Enstrom: TH-180 Flight Test Program Delayed Only Slightly | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Mar 02, 2016

Enstrom: TH-180 Flight Test Program Delayed Only Slightly

Second Flight Test Aircraft Is Nearing Completion

Enstrom says that the hard landing experienced by its prototype TH-180 helicopter on February 12th will force only a minimal delay in the certification of the aircraft.

The prototype TH-180 Enstrom Helicopter N180TH experienced a mechanical problem and made a forced landing in February. During the landing, the rotor struck a wooden utility pole, cutting off the pole and destroying the main rotor blades. The pilot, the only person on board, was uninjured. Preliminary investigation indicates that a piece of flight test instrumentation in the main drive system failed, disconnecting the engine from the drive train. Enstrom believes this accident demonstrated the ruggedness of the design and the ability of the aircraft to protect the occupants.

“Enstrom’s second TH-180 flight test vehicle was already in production and we are working on completion ahead of the original schedule," said William Taylor, Co-Program Manager of the TH180 program. "This aircraft is expected to begin flying in April or May timeframe. By rearranging our certification flight test schedule, we anticipate this accident will cause only a minimal delay for the program.”

(Source: Enstrom news release. Image from file)

FMI: www.enstromhelicopter.com


Advertisement

More News

ANN's Daily Aero-Term (11.29.25): Waypoint

Waypoint A predetermined geographical position used for route/instrument approach definition, progress reports, published VFR routes, visual reporting points or points for transiti>[...]

ANN's Daily Aero-Linx (11.29.25)

Aero Linx: Sentimental Journey to Cub Haven Sentimental Journey Flyin began in 1986 with a group of dedicated volunteers working to provide a sentimental return to Lock Haven, the >[...]

NTSB Prelim: Jabiru USA Sport Aircraft LLC J230-SP

The Pilot Would Often Fly Over Their House At A Low Altitude And That Family Members Would Go Outside To Wave On November 14, 2025, at 1708 eastern standard time, a Jabiru USA Spor>[...]

Classic Aero-TV: Crafting The Future of eVTOL Infrastructure

From 2024 (YouTube Edition): Volatus Infrastructure Paves The Way The name “Volatus” seems to be everywhere these days, popping up in a series of partnerships and proje>[...]

Klyde Morris (11.28.25)

Fortnite Conquers All, Klyde FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC