NASA Awards Rapid II Space Development Contracts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Mar 22, 2007

NASA Awards Rapid II Space Development Contracts

Inexpensive Satellites The Goal

Aero-News learned this week NASA selected Space Systems Loral of Palo Alto, CA and MicroSat Systems of Littleton, CO for award of two Rapid Spacecraft Development Office -- known as Rapid II -- contracts with a minimum value of $50,000 each.

This award is under a commercial, fixed price, indefinite delivery/indefinite quantity contract. Each of the Rapid II contracts has a potential maximum value of $1.5 billion.

Rapid II is a multiple award contract for core spacecraft systems and non-standard services. The services may include operations, components and studies to meet the government's space, Earth science and technology needs.

The principal purpose of this contract is to provide core spacecraft systems with any necessary modifications to meet specific mission needs. The baseline scope of work includes fabrication and test of the spacecraft with mission specific design modifications; generation of interface control documents, instrument and full spacecraft integration; test, shipment to launch site, launch vehicle integration support and on-orbit checkout.

In January 2000, NASA awarded the initial Rapid II contracts. New vendors periodically are added if qualified. This award is the result of such an action, and the vendors are eligible to compete for future spacecraft systems that NASA or other federal agencies may require.

The principal work will be performed at the contractors' facilities with additional work required at the government launch site.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC