Deployment Of Floodwall Underway At St. Paul Downtown Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Mar 15, 2011

Deployment Of Floodwall Underway At St. Paul Downtown Airport

Precautionary Measure Against Expected Mississippi River Flooding

With spring flooding of the Mississippi River at St. Paul all but certain, work crews from the Metropolitan Airports Commission (MAC) began deploying temporary sections of floodwall at St. Paul Downtown Airport (KSTP) on Monday. “Prior to developing the floodwall in 2009, flooding sometimes caused hundreds of thousands of dollars of damage and expense and closed St. Paul Downtown Airport for weeks at a time,” said MAC Executive Director Jeff Hamiel. “The floodwall is designed to protect the airport against a hundred-year flood, safeguarding infrastructure and minimizing operational impacts.”

This is the fourth time the floodwall has been deployed at the airport, having been erected once in 2009 and twice in 2010. The 9,532’ dike includes 4,563’ of permanently installed sheet pile wall, 3,595’ of temporary, deployable wall and 1,374’ of earthen levee. MAC staff can deploy temporary sections of the wall in about a week.

Portions of the wall along Bayfield Street and those crossing the airport’s two shortest runways, 13-31 and 9-27, will be erected first, leaving the longest, primary runway, 14-32, unaffected as long as possible. As the water rises, the MAC will close storm sewer gates to prevent river water from backing up onto the airport, and pumps will be activated to drain water that does collect there.

If necessary, MAC also will install the deployable wall crossing the far southeastern end of 14-32, sealing off the airfield from the river. Barring unforeseen circumstances, Runway 14-32 will remain operational with the wall in place, but the landing threshold will be displaced, shortening the operational portion of runway pavement from 6,491’ to 5,341’. The two shorter runways already have been temporarily closed. The Federal Aviation Administration will remove navigational aids located outside the floodwall to protect them from water damage. The wall will remain in place until the danger of flooding has passed.

FMI: www.mspairport.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC