P-8A Aircraft Gets Green Light To Enter Full Rate Production | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jan 28, 2014

P-8A Aircraft Gets Green Light To Enter Full Rate Production

Approval Granted January 3 To Ramp Up From Low Rate Production

On the heels of the P-8A Poseidon squadron’s inaugural deployment, the Maritime Patrol and Reconnaissance Aircraft Program Office (PMA-290) recently announced it entered the full-rate production (FRP) phase of its development. The approval, reached Jan. 3 from the FRP Milestone Decision Authority will allow the program office, resource sponsor, acquisition community and industry to continue to deliver the P-8A to the fleet with the required capabilities needed to ensure the squadrons are getting a stable and efficient system.

"This significant milestone approval moves the program from low-rate into full-rate production, and allows us to manufacture the remaining aircraft over the next several years with an opportunity for a cost-effective procurement," said Cmdr. Tony Rossi, the integrated product team lead for the P-8A program.
 
Aligned under the Naval Air Systems Command, the program's current objective is to deliver 117 aircraft to the fleet. Thirteen of 37 Low Rate Initial Production (LRIP) aircraft have already been delivered to fleet squadrons, with all deliveries on or ahead of schedule. As the Naval Fleet Forces transition to the P-8A, from the P-3C, the Sailors will use these LRIP and future FRP aircraft to train and participate in operational missions.
 
Currently, Patrol Squadron 16 (VP-16), who deployed in December, is equipped with LRIP aircraft. VP-16 and the second squadron with LRIP P-8As will receive their next upgrades through increments 2 and 3, which are the follow-up phases for capabilities for the P-8A aircraft and weapons systems. The next significant milestone for the P-8A program is initial operational capability (IOC) for Increment 2, which is scheduled for 2016, Rossi said.
 
The P-8A’s current configuration, Increment 1, consists of the following capabilities: persistent armed anti-submarine warfare (ASW), an integrated sensor suite, and significant improvement in situational awareness. Increment 2 will consist of multi-static active coherent acoustics, automated identification system, and high-altitude ASW weapon capability.
 
"This FRP milestone is a testament to the incredible effort and dedication of the P-8A team to deliver the P-8A to the fleet as planned,” said Capt. Scott Dillon, PMA-290 program manager. “The team has accomplished a lot over the last six months, from passing the Initial Operational Test and Evaluation period this summer to achieving IOC this fall and the P-8's first operational deployment this winter. We are moving forward with a successful start to 2014 with the announcement of FRP. The high-quality work of the P-8A team has made this milestone possible. We look forward to having continued successes within the program."

(Image provided by NAVAIR)

FMI: www.navair.navy.mil

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC