AD: Eurocopter Deutschland GmbH Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.24.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.24.13 **

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Tue, Jun 26, 2012

AD: Eurocopter Deutschland GmbH Helicopters

AD NUMBER: 2012-11-02

PRODUCT: Certain Eurocopter Deutschland GmbH (ECD) Model EC135 helicopters.
SUBJECT: Airworthiness Directive 2012-11-02
ACTION: Final rule; request for comments.

SUMMARY: The FAA is adopting a new airworthiness directive (AD) that supersedes an existing Emergency Airworthiness Directive (EAD) for the products listed above. The existing EAD, which was previously sent to all known U.S. owners and operators of ECD Model EC135 helicopters and not made generally effective by publication in the Federal Register, currently requires inspecting the ring frame between the rear structure tube (tailboom) and the tail rotor fenestron housing (fenestron housing) for a crack before the first flight of each day and replacing any cracked ring frame with an airworthy ring frame. Since we issued that EAD, we have determined that a pre-flight pilot check in conjunction with a recurring 25-hour inspection is sufficient for determining the airworthiness of the ring frame. Additionally, ECD has developed a modification that is terminating action for the requirements of that EAD. This superseding AD revises the inspection requirements of the EAD to allow an owner/operator to perform the pre-flight pilot check, adds a recurring inspection of the ring frame, and allows for installation of a ring frame reinforcement as an optional terminating action for the AD requirements.

The actions are intended to detect a crack in the ring frame which could result in loss of the fenestron structure and subsequent loss of control of the helicopter.

DATES: This AD becomes effective July 10, 2012. Comments on this AD are due by August 24, 2012.

FMI: AD

Advertisement

More News

Update: Startling... FAA Wants EAA To Pay Them To Staff Oshkosh

Could The FAA Get ANY Stranger? Worse Yet... Will They? ANN RealTime News Update, 1324ET, 05.23.13: Well... the statement we were promised YESTERDAY showed up today... and it doesn>[...]

Aspen Avionics Evolution Backup Display Expands To Piper Archer, Seminole

Aspen’s All Digital Backup Display Will Give Flight-Training Students The Total Glass Panel Experience Aspen Avionics announced Tuesday that Piper Aircraft has selected the E>[...]

Classic Aero-TV: EAA’s Jack Pelton – ‘Everything’s Going to Be OK’

Building A New Future For The EAA... One Issue At A Time Originally WebCast 11.14.12: With only a couple of weeks in pocket, directing the reorganization of the EAA in the wake of >[...]

House Committee Hearing Focuses On Strategic Stepping Stones To Mars

Subcommittee Chair Call Mars Mission A Congressional Priority The House Science Committee Subcommittee on Space held a hearing Tuesday to examine possible options for the next step>[...]

Dassault Falcon Embarks On Spares Pricing Overhaul

Third Such Restructuring In 10 Years Dassault Falcon has embarked on its third parts pricing overhaul in the past 10 years, assessing the cost of over 18,500 individual items. The >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC