Shuttle Program Gets Another Black Eye | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.24.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.24.13 **

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Wed, Mar 24, 2004

Shuttle Program Gets Another Black Eye

Speed Brake Gears Were Installed Backward   

As if NASA needed any more controversy with its shuttle fleet program, the agency just released findings that would make any astronaut cringe. NASA said it will replace braking mechanisms on all its space shuttles after discovering some of the gears were installed backward. Shuttle program manager Bill Parsons said Monday he has launched an investigation into why the rudder speed brake gears — all old original parts in the shuttle tails — were never inspected in more than two decades of flight. If one of the improperly installed gears had been in a high-stress position, it probably would have led to the destruction of the spacecraft at touchdown, he said.

"Bottom line is, it was not good," Parsons said.

The reversed gears found recently in Discovery were in the least stress-prone position and never failed. But one of the replacement gears — a spare set that was also installed backward — would have ended up in a much more high-stress location in the tail. The installation problem surfaced late last year and prompted NASA to delay the next shuttle flight from fall 2004 to spring 2005.

All the rudder speed brake gears in NASA's inventory — dating as far back as the 1970s — are being X-rayed to see whether they were properly built, and to look for rust and microcracks, already spotted on some gears. Parsons said new or refurbished gears should be installed in time for shuttle flights to resume next March, after a two-year grounding following the Columbia tragedy.

"Because of the way these gears go together, you can actually make a mistake and put them in incorrectly, and there was not a good process back in the timeframe" to catch mistakes, Parsons said. He said the maker of the rudder speed brake mechanisms, Hamilton Sundstrand in Rockford (IL), now has better quality control.

At the same time, NASA is inspecting the plumbing in each of its three remaining shuttles. The hoses in question are also original shuttle parts and some are starting to leak, Parsons said. Parsons said engineers are making good progress on the inspection booms and wing-repair kits that will be required on all future shuttle flights.

"As we deal with aging vehicle kind of issues, we will find other things along these lines as well, I'm sure," he said

While Discovery is scheduled to fly first, the Atlantis must be ready to launch quickly and assist the Discovery via the international space station, if a problem were to arise. This is part of a new mandate enacted as a result of the Columbia accident investigation.

Columbia was destroyed and its seven astronauts were killed during re-entry last year because of a hole in the left wing caused by a piece of insulating foam that broke free at liftoff.

FMI: http://spaceflight.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.24.13)

Stormbirds A confederation of Luftwaffe-related web sites, providing reference-grade coverage of the Messerschmidt 262 and other advanced combat aircraft of the Third Reich.>[...]

ANN's Daily Aero-Term (05.24.13): Terrain/Obstruction Alert

A safety alert issued by ATC to aircraft under their control if ATC is aware the aircraft is at an altitude which, in the controller's judgment, places the aircraft in unsafe proxi>[...]

Aero-News: Quote Of The Day (05.24.13)

"You have a huge job ahead of you. The challenges are many and the solutions are hard." Source: Senate Commerce Committee Chair Jay Rockefeller (D-WV).>[...]

ANN FAQ: ANN's News Portal Syndication Program

Get A Customized ANN News Portal For YOUR Website! As we promised, the ever-so-busy software geeks at ANN have been working overtime on a number of cool new tools and toys... and t>[...]

AF Seven Summits Team Scales Everest

Effort To Raise Funds And Awareness For The Special Operations Warrior Foundation A group of Airmen with the Air Force Seven Summits team reached the highest point of the world, Mo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC