Moon-Bound NASA Spacecraft Passes Major Preflight Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.17.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.17.13 **

** AIRBORNE 05.14.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.14.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Wed, Jun 25, 2008

Moon-Bound NASA Spacecraft Passes Major Preflight Tests

LCROSS Probe Nears Late 2008 Launch

Engineering teams are conducting final checkouts of the Lunar Crater Observation and Sensing Satellite, known as LCROSS, that will take a significant step forward in the search for water on the moon.

The mission's main objective is to confirm the presence or absence of water ice in a permanently shadowed crater near a lunar polar region. A major milestone, thermal vacuum testing of the LCROSS spacecraft, was completed June 5 at the Northrop Grumman facility in Redondo Beach, CA.

To simulate the harsh conditions of space, technicians subjected the spacecraft to 13.5 days of heating and cooling cycles during which temperatures reached as high as 230 degrees Fahrenheit and as low as minus 40 degrees. Previous testing for the LCROSS spacecraft included acoustic vibration tests. Those tests simulated launch conditions and checked mating of connection points to the Atlas V rocket's Centaur upper stage and the adapter ring for the Lunar Reconnaissance Orbiter, known as LRO.

The satellite currently is undergoing final checkout tests. After all tests are complete, the LCROSS spacecraft will be prepared for delivery to NASA's Kennedy Space Center in Florida for launch processing and integration onto the Atlas V as a secondary payload to LRO. Both spacecraft are scheduled to launch from Kennedy in late 2008.

"The spacecraft steadily has taken shape since Ames delivered the science payload in January," said Daniel Andrews, LCROSS project manager at NASA's Ames Research Center in Moffett Field, CA. "It is a testament to the hard work, perseverance and expertise of the NASA and Northrop Grumman teams that the spacecraft has completed these critical tests ahead of schedule."

After launch, the LCROSS spacecraft and the Atlas V's Centaur upper stage rocket will execute a fly-by of the moon and enter into an elongated Earth orbit to position the satellite for impact on a lunar pole. On final approach, the spacecraft and the Centaur will separate. The Centaur will strike the surface of the moon, creating a debris plume that will rise above the surface. Four minutes later, LCROSS will fly through the debris plume, collecting and relaying data back to Earth before impacting the lunar surface and creating a second debris plume. Scientists will observe both impacts from Earth to gather additional information.

LCROSS is billed by NASA as a fast-paced, low-cost mission that is leveraging existing NASA systems, commercial-off-the-shelf components and the spacecraft design and development expertise of integration partner Northrop Grumman Space Technologies.

FMI: http://lcross.arc.nasa.gov/, http://moon.msfc.nasa.gov/, www.nasa.gov/exploration

Advertisement

More News

Aero-Help Wanted: ANN Needs A Good Honest Marketing Manager

ANN/Aero-TV Marketing Department Needs Part or Full Time Personnel Since ANN started, we have enjoyed the amazing support of a group of sponsors who have, by and large, been genero>[...]

Aero-News: Quote Of The Day (05.20.13)

"On his last day in the country he gave his life for, Tyler was working on his RV-8 at the EAA hangar. He spoke to (chapter member) Vance Simons, who had become a friend since he i>[...]

Klyde Morris (05.20.13)

Klyde Does 'Drone' On... FMI: www.klydemorris.com>[...]

Airborne 05.17.13: X-47B Carrier Launch, New CAF Base, Space Oddity... For Real

Also: Wanna Buy A Control Tower?, SAC 7-35 Airdata Computer, Remembering Frank Beagle, Exp 35 Astros Drop In, 777X Team Named, AF Academy Grads Will Get Their Flyover! The X-47B Un>[...]

Flight Test Engineer Turns Real-Life Experience Into New Novel

Historical Fiction Set Against Invasion Of Kuwait In 1990 In order to succeed in his invasion of Kuwait on August 2, 1990, Saddam Hussein needed weapons. Weapons lead to questions:>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC