Ariane 5 Launcher Initial Assembly Completed In French Guiana | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 05.17.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.17.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Mon, Jun 18, 2012

Ariane 5 Launcher Initial Assembly Completed In French Guiana

Booster For The 4th Planned Launch This Year

Initial assembly of the fourth Ariane 5 for launch by Arianespace in 2012 has been completed at the Spaceport in French Guiana, marking a new milestone in preparations for a mission to loft a dual-passenger payload later in the year. The heavy-lift Ariane 5 ECA version is located in the Launcher Integration Building, where it took shape during a multi-step process that began with positioning of the vehicle’s cryogenic core stage over the mobile launch table. The two solid propellant boosters were then mated to the core stage, followed by a “topping off” installation of the cryogenic upper stage and vehicle equipment bay – which were pre-integrated as a single component.

This is the 64th Ariane 5 to take shape at the Spaceport, and will continue the cadence with Arianespace’s workhorse launcher. Designated as Flight VA208 in reference to the 208th flight of an Ariane family vehicle, the launcher is to carry a two-passenger commercial telecommunications satellite payload – the primary mission application for Ariane 5.
 
The launch will follow Arianespace’s next Ariane 5 flight (VA207), scheduled to lift off on July 5 with the EchoStar XVII high-throughput relay platform for Hughes Network Systems, and the MSG-3 meteorological spacecraft for EUMETSAT (the European Organization for the Exploitation of Meteorological Satellites).
 
The VA207 flight’s Ariane 5 currently is in the Spaceport’s Final Assembly Building, ready for integration of the EchoStar XVII and MSG-3 satellites. (Image provided by Arianespace)

FMI: www.arianespace.com

Advertisement

More News

X-47B Accomplishes Its First Ever Carrier Touch And Go

Maneuver Performed Aboard CVN 77 The Navy's X-47B Unmanned Combat Air System Demonstrator (UCAS-D) began touch and go landing operations aboard the aircraft carrier USS George H.W.>[...]

Honeywell's New HTF7350 Engine To Power Bombardier Challenger 350

HTF7000 Series Surpasses 1.5 Million Flight Hours With Better Than 99 Percent Dispatch Reliability Honeywell has announced that its HTF7350, the latest engine to join its successfu>[...]

Airborne 05.21.13: Cirrus Chute Fails, NASA Record, More NIMBY Nonsense

Also: PC-12 Record, Maule Nation, Cockpit Lockout, 34,000 Airliners Needed, Beechcraft Wins Big Contract You know you're having a bad day when a flight goes so bad that you feel yo>[...]

Helo Crew Missing From Vietnam War Accounted For, Interred At Arlington

Four Buried As A Group May 2 A Navy Pilot, missing from the Vietnam War, has been accounted-for and was buried with full military honors along with his crew. According to the Depar>[...]

ANN's Daily Aero-Linx (05.21.13)

Forest Service Smoke Jumpers Smokejumping was first proposed in 1934 by T.V. Pearson, the Forest Service Intermountain Regional Forester, as a means to quickly provide initial atta>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC