First F-35 Center Fuselage Produced By Integrated Assembly Line Delivered | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 05.17.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.17.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Tue, Apr 03, 2012

First F-35 Center Fuselage Produced By Integrated Assembly Line Delivered

IAL Will Increase Affordability For The Joint Strike Fighter

The first F-35 center fuselage produced by Northrop Grumman's Integrated Assembly Line (IAL) was delivered to Lockheed Martin on March 16, 2012. While the company has delivered 69 center fuselages since 2005, this is the first produced using the IAL. The IAL maximizes robotics and automation, providing additional capacity and assembly capability while meeting engineering tolerances that are not easily achieved using manual methods.

The IAL will be central in producing the F-35's center fuselage as well as increasing the program's affordability, quality and efficiency. The technologies deployed on the IAL have created more efficient and ergonomic process for assembly. The IAL was developed and designed with the help of the Detroit-based KUKA Robotics Aerospace Division, a commercial automation integrator, and was inspired by automation systems used by American automakers.

The IAL design uses a system-engineering approach to integrate tooling and structure transport, system automation, automated drilling cells and tooling mechanization coordinated across multiple build centers.

"The Integrated Assembly Line's approach to tool design and fabrication marks a transition into a new way of business for Northrop Grumman," said Michelle Scarpella, vice president of the F-35 program for Northrop Grumman. "Through the implementation of a much more efficient design-to-assembly process, the Integrated Assembly Line enables the team to simultaneously achieve higher quality, reduce costs and increase efficiency."

As a principal member of the Lockheed Martin-led F-35 industry team, Northrop Grumman performs a significant share of the work required to develop and produce the aircraft. In addition to producing the F-35 center fuselage, Northrop Grumman also designed and produces the aircraft's radar and other key avionics including electro-optical and communications subsystems; develops mission systems and mission-planning software; leads the team's development of pilot and maintenance training system courseware; and manages the team's use, support and maintenance of low-observable technologies.

To date, the company has delivered every center fuselage on time and continues to meet its cost and schedule commitments. In 2011, the company delivered 22 center fuselages and it will make its 100th delivery in December 2012.

Northrop Grumman's Palmdale, Calif., site is a world-class facility that provides assembly, integration, testing and long-term maintenance capabilities for the F-35, and some of the world's most advanced aircraft, including B-2 Spirit and RQ-4 Global Hawk.

FMI: www.northropgrumman.com

Advertisement

More News

Update: Startling... FAA Wants EAA To Pay Them To Staff Oshkosh

Could The FAA Get ANY Stranger? Worse Yet... Will They? ANN RealTime News Update, 0001ET, 05.23.13: The FAA has twice promised ANN a statement this day in order to understand some >[...]

Classic Aero-TV: EAA’s Jack Pelton – ‘Everything’s Going to Be OK’

Building A New Future For The EAA... One Issue At A Time Originally WebCast 11.14.12: With only a couple of weeks in pocket, directing the reorganization of the EAA in the wake of >[...]

House Committee Hearing Focuses On Strategic Stepping Stones To Mars

Subcommittee Chair Call Mars Mission A Congressional Priority The House Science Committee Subcommittee on Space held a hearing Tuesday to examine possible options for the next step>[...]

Dassault Falcon Embarks On Spares Pricing Overhaul

Third Such Restructuring In 10 Years Dassault Falcon has embarked on its third parts pricing overhaul in the past 10 years, assessing the cost of over 18,500 individual items. The >[...]

ANN's Daily Aero-Linx (05.23.13)

Chandelle Chandelle is meant to be a forum for original essays, reviews, photographs, and artwork related, however loosely, to the less familiar aspects of the history of aviation.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC