First Flyable A350 XWB 'MSN-001' Structurally Complete | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

Airborne Hi-Def On YouTube

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Wed, Dec 05, 2012

First Flyable A350 XWB 'MSN-001' Structurally Complete

Aircraft Makes Its 1st Journey 'On Wheels'

Airbus has successfully completed the main structural assembly and system connection of A350 XWB ‘MSN-001’ – the first flight-test aircraft. The aircraft is shown here on its wheels for the very first time moving out of the main assembly hall (Station 40) at the recently inaugurated “Roger Béteille” A350 XWB Final Assembly Line in Toulouse. It then entered the adjacent indoor ground test station (Station 30).

The assembly work performed in Station 40 included the successful electrical power-on of the aircraft's entire fuselage and wings. Soon work in Station 30 will start by testing the aircraft's hydraulic system, followed by the full electric and hydraulic power-on of the aircraft which will be completed by around the end of the year. This will mark the start of several weeks of comprehensive functional system testing.

After the A350 XWB MSN-001 exits station 30, the aircraft will go through a series of extensive production and certification / development tests, be painted and have its engines installed. It will then be delivered to the flight-line and be readied for its first flight in mid-2013.

(Image provided by Airbus)

FMI: www.airbus.com

Advertisement

More News

Airborne At OSH15 Day 5 Redux: Inhofe's Mission, NextGen GA Fund, New Kitfox

Also: Cicare 8, Switchblade Update, Beringer Alaskan Bush Gear, Jack Pelton Interview - Final E-I-C Note: Regularly Daily Airborne Unlimited Programming will resume this Monday now>[...]

Klyde Morris 07.31.15

Precision Targeting, Or Just Blind Luck? FMI: www.klydemorris.com>[...]

AD: Turbomeca S.A. Turboshaft Engines

AD NUMBER: 2015-13-04 PRODUCT: All Turbomeca S.A. Arriel 1A1, 1A2, 1B, 1C, 1C1, 1C2, 1D, 1D1, 1E2, 1K1, 1S, 1S1, 2B, 2B1, 2C, 2C1, 2C2, 2S1, and 2S2 turboshaft engines.>[...]

AD: The Boeing Company Airplanes

AD NUMBER: 2015-13-06 PRODUCT: Certain Boeing Model 747-400 and 747-400F series airplanes.>[...]

ANN's Daily Aero-Linx (07.31.15)

KRnet - Mailing List for KR Experimental Aircraft Builders and Pilots KRnet is a free Internet mailing list devoted to helping KR builders and pilots to construct and fly their KR >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC