NASA: Phoenix Won't Rise As Scheduled On Friday | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 06.18.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 06.18.13 **

** AIRBORNE 06.14.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 06.14.13**

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Tue, Jul 31, 2007

NASA: Phoenix Won't Rise As Scheduled On Friday

Mars Lander Launch Delayed 24 Hours

NASA announced Tuesday this week's scheduled launch of NASA's Phoenix Mars Lander aboard a United Launch Alliance Delta II rocket has been postponed 24 hours. The two available launch times on Saturday, August 4 are 5:26:34 am, and 6:02:59 am EDT.

Due to a forecast for severe weather around the Kennedy Space Center launch pad in Florida on Tuesday afternoon, fueling of the second stage will not be completed. Although fueling is expected to be finished Wednesday morning, NASA says there isn't enough breathing room for contingency time in the schedule to move forward with the launch on Friday.

The $386 million Phoenix mission will attempt to drill the surface of the Martian polar region, looking for signs of water and life. First, however, it must complete a successful launch... and survive its 10-month journey to the red planet.

Then, it must land and avoid shutting off its rocket engines 130 feet above the ground, like 1999's Mars Polar Lander did. The resulting crash destroyed that probe, and halted NASA's 2001 Mars Surveyor program.

In the hopes the new probe will be a success, it has been named Phoenix... after the mythical bird which dies in a fire, but is reborn from the ashes. But there will be nothing hot about the existence of this Phoenix -- the probe is only expected to operate about five months, before it succumbs to temperatures of minus 120 degrees Fahrenheit.

FMI: www.nasa.gov/phoenix

Advertisement

More News

Aero-TV: Garmin’s GNC-255 –- Back To Basics

Garmin's New Aviation VHF Radios Early this year, a new series of aviation VHF COM and NAV/COM radios, the GTR and GNC series, was announced by Garmin. As the replacement products >[...]

EADS And Siemens Enter Long-Term Research Partnership

Sign MoU With Diamond Aircraft On Electric Propulsion System EADS and Siemens are entering into a long-term research partnership to introduce new electric propulsion systems that c>[...]

ANN's Daily Aero-Term (06.19.13): Ceiling

The heights above the earth's surface of the lowest layer of clouds or obscuring phenomena that is reported as broken, overcast, or obscuration, and not classified as thin or parti>[...]

ANN's Daily Aero-Linx (06.19.13)

The Army Aviation Heritage Foundation The Army Aviation Heritage Foundation (AAHF) is a non-profit public educational foundation dedicated to presenting the Army Aviation story to >[...]

Aero-News: Quote Of The Day (06.19.13)

“The serial electric propulsion allows us to design airplanes with totally different characteristics than today. Vertical take-off and high-speed cruise can be realized in a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC