Army Reportedly Leaning Towards New Scout Helicopter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.29.25

AirborneNextGen-
09.30.25

Airborne-Unlimited-10.01.25

Airborne-Affordable Flyers-10.02.25

AirborneUnlimited-10.03.25

Tue, Dec 04, 2012

Army Reportedly Leaning Towards New Scout Helicopter

Other Option Is Extending The Life Of The Kiowa Warrior

Army officials are reportedly backing a plan to replace the long-serving OH-58 Kiowa Warrior scout helicopter, rather than try to extend the life of the existing aircraft which first flew during the Vietnam era. If a new aircraft is pursued, it will be the Army's third attempt to procure a replacement.

Reuters reports that a new acquisition program was agreed to last week by Army acquisition chief Heidi Shyu and others, but sources not authorized to speak to the media told the news service that the program does not yet have the blessing of the Pentagon or senior Army officials.

The major players are already lining up with proposals for the replacement aircraft. Boeing says it will offer an armed version of the AH-6 Little bird. Interest has also been expressed by Eurocopter, Bell Helicopter, AgustaWestland, MD Helicopters, and AVX Aircraft.

A lot hinges on flight demonstrations currently underway by several of the companies, along with visits to factories of the manufacturers which do not have a demonstrator currently available. The Army says that no decision would be made until after those demonstrations are complete.

And then there is the federal budget and sequestration to consider, though Army officials say that the program could well proceed even if the automatic spending cuts amounting to $500 billion over ten years are triggered in January.

If a new procurement program goes forward, it would be the latest effort in a series dating back to 2004. Bell Helicopter had begun work on an armed reconnaissance helicopter for the Army in 2008, but that program was cancelled when costs rose sharply beyond the original estimates.

(Kiowa Warrior image from file)

FMI: www.army.mil

Advertisement

More News

ANN's Daily Aero-Term (10.01.25): Secondary Radar/Radar Beacon (ATCRBS)

Secondary Radar/Radar Beacon (ATCRBS) A radar system in which the object to be detected is fitted with cooperative equipment in the form of a radio receiver/transmitter (transponde>[...]

ANN's Daily Aero-Linx (10.01.25)

Aero Linx: Royal Aeronautical Society (RAeS) As the only professional body dedicated to aerospace, aviation and space communities, we exist to further the advancement of aeronautic>[...]

NTSB Final Report: Cessna 190

While Conducting A Wheel Landing The Tailwheel Equipped Airplane, It Bounced Twice... Analysis: The pilot reported that while conducting a wheel landing the tailwheel equipped airp>[...]

Airborne Affordable Flyers 10.02.25: MOSAIC Start Date, AFE25 Tickets, ePulitzer

Also: Bristell Receives Part 23, Sonex Highwing Webinar, AV-30-C Update, MOSAIC Consultancy The GA community is eagerly anticipating the date that marks the beginning of a new era >[...]

ANN's Daily Aero-Term (10.02.25): Radar Contact Lost

Radar Contact Lost Used by ATC to inform a pilot that the surveillance data used to determine the aircraft's position is no longer being received, or is no longer reliable and rada>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC