Diamond Rolls Out D-Jet S/N002 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Jul 20, 2007

Diamond Rolls Out D-Jet S/N002

First Flight Expected In August

On Friday, July 20, 2007 Diamond Aircraft celebrated the roll out of its second single-engine D-Jet, S/N002.  S/N002 is the first D-Jet intended to conform to the expected production configuration in its structural layout, and aerodynamic design.

From the photos, the most obvious differences between the two aircraft are the lack of winglets on S/N002, as well as deicing surfaces on the leading edges of the wing, and horizontal and vertical stabilizers. The production-spec aircraft also incorporates a pair of small stablizers on the underside of the empennage, added to the prototype during flight testing, as well as what appears to be an aluminum-framed forward windscreen.

The D-Jet team is now preparing S/N002 for first flight next month, while simultaneously building the next three certification test planes on the same production-spec tooling used for S/N002.

The most obvious differences between the two aircraft are the lack of winglets on S/N002, as well as a larger windshield on the production-spec aircraft.

Diamond expects to certify the D-Jet by in mid-2008, with deliveries starting immediately thereafter.

The London, Ontario planemaker reports demand for the D-Jet has been very strong, with over 300 orders taken world-wide. The North American retail delivery schedule is completely sold out for the first year and a half of production, with only a very limited number of Premium deposit slots available for late 2009 delivery from select Diamond Distributors.

FMI: www.diamondair.com

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC