Qatar Airways Grounds One Of Its Three Dreamliners | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.29.25

AirborneNextGen-
09.30.25

Airborne-Unlimited-10.01.25

Airborne-Affordable Flyers-10.02.25

AirborneUnlimited-10.03.25

Mon, Dec 17, 2012

Qatar Airways Grounds One Of Its Three Dreamliners

Airplane Developed An Electrical Problem Similar To One That Cropped Up On A UCH 787

Qatar Airways says it has been forced to ground one of its three Dreamliners because of an electrical problem that forced them to take the jet out of service. A similar problem was discovered recently in a 787 belonging to United Continental Holdings.

Qatar Airways CEO Akbar Al Baker was not pleased. He said in an interview at Heathrow in London Thursday that the airline would "demand compensation from Boeing," according to a report from Reuters.

The airplane was grounded December 9th. Al Baker said that the airplane would not fly until Boeing had repaired the aircraft, which the company said it was working to get done. But the planemaker said it was not certain that the issue was with a power generator, as was the case with a Dreamliner belonging to United Continental which was forced to make an emergency landing December 4 when one of the three units on board failed.

Boeing said it would "evaluate the findings in Qatar" to get to the root cause of the problem before determining what the next steps should be.

Al Baker said that he was concerned that having similar problems occur on such new airplanes could be a symptom of wider problems with the jet. He blamed the Dreamliner's delays for slowing the airline's expansion plans.

Qatar Airways has 60 Dreamliners on order, with the next deliveries scheduled for December 19th.

(Image from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (10.01.25): Secondary Radar/Radar Beacon (ATCRBS)

Secondary Radar/Radar Beacon (ATCRBS) A radar system in which the object to be detected is fitted with cooperative equipment in the form of a radio receiver/transmitter (transponde>[...]

ANN's Daily Aero-Linx (10.01.25)

Aero Linx: Royal Aeronautical Society (RAeS) As the only professional body dedicated to aerospace, aviation and space communities, we exist to further the advancement of aeronautic>[...]

NTSB Final Report: Cessna 190

While Conducting A Wheel Landing The Tailwheel Equipped Airplane, It Bounced Twice... Analysis: The pilot reported that while conducting a wheel landing the tailwheel equipped airp>[...]

Airborne Affordable Flyers 10.02.25: MOSAIC Start Date, AFE25 Tickets, ePulitzer

Also: Bristell Receives Part 23, Sonex Highwing Webinar, AV-30-C Update, MOSAIC Consultancy The GA community is eagerly anticipating the date that marks the beginning of a new era >[...]

ANN's Daily Aero-Term (10.02.25): Radar Contact Lost

Radar Contact Lost Used by ATC to inform a pilot that the surveillance data used to determine the aircraft's position is no longer being received, or is no longer reliable and rada>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC