NASA Adds Three More Days To Discovery Delay | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sun, Feb 08, 2009

NASA Adds Three More Days To Discovery Delay

Launch Will Occur No Sooner Than February 22

Add three more days -- at least -- to NASA's timeframe for the upcoming launch of the space shuttle Discovery. Due to an ongoing review of the space shuttle's flow control valves, NASA managers announced Friday liftoff on the STS-119 mission will occur no sooner than February 22.

The space agency says the extended delay is due to ongoing analysis and particle impact testing associated with a flow control valve in the shuttle's main engines. The valve is one of three that channels gaseous hydrogen from the engines to the external fuel tank.

As ANN reported last week, NASA found one of those valves damaged in Endeavour after that shuttle's mission in November. As a precaution, Discovery's valves were removed, inspected and reinstalled.

The STS-119 mission fly the S6 truss segment and install the final set of power-generating solar arrays to the International Space Station. The S6 truss, with its set of large US solar arrays, will complete the backbone of the station and provide one-fourth of the total power needed to support a crew of six.

Commander Lee Archambault will lead Discovery's crew of seven, along with Pilot Tony Antonelli, and Mission Specialists Joseph Acaba, John Phillips, Steve Swanson, Richard Arnold and Japan Aerospace Exploration Agency astronaut Koichi Wakata.

Wakata will replace Expedition 18 Flight Engineer Sandra Magnus, who will return to Earth with the STS-119 crew. Wakata will serve as a flight engineer for Expeditions 18 and 19, and return to Earth with the STS-127 crew.

The Space Shuttle Program will hold a meeting February 13 to review data and determine whether to move forward with a flight readiness review on February 18. The official STS-119 launch date will be set at the readiness review.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

Aero-News: Quote of the Day (04.26.24)

"General aviation is at the forefront of developing and introducing innovative technologies that will transform the entire aviation industry..." Source: Kyle Martin, Vice President>[...]

ANN's Daily Aero-Term (04.27.24): Direct

Direct Straight line flight between two navigational aids, fixes, points, or any combination thereof. When used by pilots in describing off-airway routes, points defining direct ro>[...]

ANN's Daily Aero-Linx (04.27.24)

Aero Linx: Women in Corporate Aviation Women in Corporate Aviation support individuals seeking career advancement and professional development in the business aviation industry. Me>[...]

Aero-News: Quote of the Day (04.27.24)

“We would like to thank the many volunteers that help throughout the year to pull off the event, as well as the several reviewers, judges, and SURVICE staff that provide team>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC