Mars Odyssey Team To Check Status Of Backup System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Mar 07, 2009

Mars Odyssey Team To Check Status Of Backup System

Will Conduct Reboot Operation Next Week

The team operating NASA's Mars Odyssey orbiter plans a complicated reboot operation of the spacecraft's computer next week, to address a long-known, potential vulnerability of accumulated memory corruption.

"This is not a risk-free event," the agency notes, "but the Odyssey team and NASA have carefully weighed the risks of performing a cold reboot compared with the risk of doing nothing, and determined that the proper course of action is to proceed with the reboot."

The chief concern about the potential memory vulnerability stems from the length of time the spacecraft has been exposed to the accumulated effects of the space radiation environment since the last reboot, which occurred on October 31, 2003. As an additional benefit, the cold-reboot procedure will demonstrate whether Odyssey's onboard backup systems will be available should they ever be required.

"We have lost no functionality, but there would be advantages to knowing whether the B side is available," said Odyssey Mission Manager Gaylon McSmith of NASA's Jet Propulsion Laboratory, Pasadena, CA. "We have developed a careful plan for attempting to determine that."

In the years since its April 7, 2001, launch, Odyssey has not needed to use its set of spare components. The spares are called the spacecraft's "B side," which includes an identical set of a computer processor, navigation sensors, relay radio and other subsystems. To use any of them, Odyssey would have to shift to all of them at once from its primary set of components, called the "A side."

On March 21, 2007, the B-side spare of an electronic component for managing the distribution of power, called the high-efficiency power supply, became inoperable. If it is permanently disabled, then none of the B side is available for use. Engineers have investigated the inoperability of the B-side high-efficiency power supply. They concluded that the component can probably be made to work properly again by rebooting the orbiter's computer, although the memory-vulnerability issue that is the current concern is not directly related to the March 2007 event that affected the power supply.

Odyssey is in the third two-year extension of its mission at Mars. Some A-side components, such as the UHF radio used for communications with spacecraft on the surface of Mars, have worked as long as they were designed to last.

In addition to its own major scientific discoveries and continuing studies of the planet, the Odyssey mission has played important roles in supporting the missions of the Mars rovers Spirit and Opportunity and the Phoenix Mars Lander.

FMI: www.nasa.gov/mission_pages/odyssey

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC