Sierra Technical Services Completes Major Milestone On Its 5GAT Drone | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Jan 17, 2020

Sierra Technical Services Completes Major Milestone On Its 5GAT Drone

Engine Run Testing Completed On the 5th Generation Target Drone For The Department of Defense

Sierra Technical Services, Inc. (STS) achieved a major milestone on the 10th of January with the completion of Engine Run Testing on the 5th Generation Aerial Target (5GAT). The 5GAT contract is administered by the U.S. Army Corp of Engineers Contracting Office (USACE) located in Sacramento, CA and is managed by the Office of the Secretary of Defense, Director of Operational Test and Evaluation (OSD/DOT&E).

STS was awarded a Prime Contract in March 2017 to design, manufacture, assemble, integrate and ground/flight test the 5GAT Demonstrator and has provided subject matter expertise to the U.S. Government while developing the design of the 5GAT aircraft concept since 2008.

The 5GAT aircraft is intended to meet specialized needs regarding “threat representative” adversaries that the U.S. Warfighter may encounter in an aerial combat situation. The 5GAT is a high-performance, unmanned, fighter-size aircraft that will be utilized for Air-to-Air and Surface-To-Air weapons evaluation, pilot training, and ground forces training when translated into production as the Next Generation Aerial Target (NGAT). The 5GAT Demonstrator First Flight is scheduled to take place early in 2020.

"This is an exciting day and major milestone achievement with the completion of these Engine Run Tests leading up to our flight test phase expected in the 1 st quarter of 2020," said Roger Hayes, president and CEO of STS. "I am extremely proud of our very small and dedicated 5GAT Team. This is a major step forward to providing our warfighters an attritable, low-cost, high-performance, full-scale, 5th Generation Aerial Target that can be also be used by the Department of Defense (DoD) for other emerging projects such as NGAT, Loyal Wingman, and Sky Borg."

(Image provided with Sierra Technical Services news release)

FMI: www.sierratechnicalservices.com

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC