Boeing Team to Develop Spacecraft Power System for DARPA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 05.17.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.17.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Thu, Jul 02, 2009

Boeing Team to Develop Spacecraft Power System for DARPA

Will Push Self-Deployed Spacecraft From Low To High Orbit And Beyond

Dust off your thinking caps to try to get your brain around this one. An industry team led by Boeing has received a contract from the Defense Advanced Research Projects Agency (DARPA) for work on Phase 2 of the Fast Access Spacecraft Testbed (FAST) program. The $15.5 million cost-plus-fixed-fee contract is currently funded to $13.8 million.

DARPA's FAST program aims to develop a new, ultra-lightweight High Power Generation System (HPGS) that can generate up to 175 kilowatts -- more power than is currently available to the International Space Station. When combined with electric propulsion, FAST will form the foundation for future self-deployed, high-mobility spacecraft to perform ultra-high-power communications, space radar, satellite transfer and servicing missions.

Boeing Phantom Works of Huntington Beach is leading the effort with support from Boeing Network and Space Systems, El Segundo, CA. The Phase 2 work will include designing, fabricating and integrating test articles, performing a series of component-level evaluations and running two full-scale system tests.

"Our team is pleased to partner with DARPA in developing this powerful new technology," said Tom Kessler, FAST program manager, Boeing Advanced Network and Space Systems. "FAST offers significant cost and performance benefits to our commercial, civil and national security customers, including new high-power applications to provide a cost-effective means for spacecraft to travel to the outer solar system."

During Phase 1 of the program, a preliminary design was developed for an HPGS capable of providing more than 130 watts per kilogram on a system that is less than half the weight and one sixth the size of an existing on-orbit solar power system. The Boeing-led team, which includes DR Technologies, Northrop Grumman Astro Aerospace, Texas A&M University, Emcore, and others, also defined the test program being conducted in Phase 2, which will verify the performance and operation of the HPGS's solar concentration, power conversion, heat rejection, structure and deployment, and sun pointing and tracking subsystems.

The Boeing team's solar concentrator design offers higher performance and greater radiation tolerance than current on-orbit solar power generation systems. Boeing will also be using different approaches to solar cell technology to include capabilities from Emcore and Spectrolab.

The size efficiency of the HPGS enables a new class of compact spacecraft that can self-deploy from low-Earth orbit to reach their final orbit using electric propulsion. This permits the use of smaller, less expensive launch vehicles that can support high-value science missions to the outer solar system without the need for expensive radioisotope power systems.

FMI: www.boeing.com

Advertisement

More News

Update: Startling... FAA Wants EAA To Pay Them To Staff Oshkosh

Could The FAA Get ANY Stranger? Worse Yet... Will They? ANN RealTime News Update, 1324ET, 05.23.13: Well... the statement we were promised YESTERDAY showed up today... and it doesn>[...]

Aspen Avionics Evolution Backup Display Expands To Piper Archer, Seminole

Aspen’s All Digital Backup Display Will Give Flight-Training Students The Total Glass Panel Experience Aspen Avionics announced Tuesday that Piper Aircraft has selected the E>[...]

Classic Aero-TV: EAA’s Jack Pelton – ‘Everything’s Going to Be OK’

Building A New Future For The EAA... One Issue At A Time Originally WebCast 11.14.12: With only a couple of weeks in pocket, directing the reorganization of the EAA in the wake of >[...]

House Committee Hearing Focuses On Strategic Stepping Stones To Mars

Subcommittee Chair Call Mars Mission A Congressional Priority The House Science Committee Subcommittee on Space held a hearing Tuesday to examine possible options for the next step>[...]

Dassault Falcon Embarks On Spares Pricing Overhaul

Third Such Restructuring In 10 Years Dassault Falcon has embarked on its third parts pricing overhaul in the past 10 years, assessing the cost of over 18,500 individual items. The >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC