Boeing Receives Type-Certification For Its Dreamlifter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 06.18.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 06.18.13 **

** AIRBORNE 06.14.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 06.14.13**

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Tue, Jun 05, 2007

Boeing Receives Type-Certification For Its Dreamlifter

Four-Plane Fleet Will Be Used To Ferry 787 Assemblies To WA

Boeing announced Monday its Dreamlifter, the specially modified 747-400 used to transport the major assemblies for the 787 Dreamliner, was granted type certification on Saturday, June 2, from the US Federal Aviation Administration (FAA).

The certification recognizes the Dreamlifter has successfully passed all of the testing and safety requirements required by the FAA. The Dreamlifter does not need to be certified by other regulatory agencies.

"This certification reflects not only the safety and reliability of the Dreamlifter but also its remarkable performance," said Scott Strode, 787 vice president of Airplane Definition and Production.

As part of the flight test program, FAA officials flew on board the Dreamlifter as it delivered major sections of the Dreamliner from partner sites around the world to the Boeing factory in Everett, WA for final assembly. Boeing reports the flights allowed the FAA to validate the overall delivery process and tools.

The Dreamlifter is not certified to carry passengers beyond essential crew. The Dreamlifter completed 437 flight-test hours and 639 hours of ground testing since its first flight on September 9, 2006.

With certification achieved, operation of the Dreamlifter fleet will soon be assumed by Evergreen International Airlines (EIA) of McMinnville, OR. EIA must first complete the required New Airplane Process Document process proving it is ready to operate the aircraft. Boeing expects the transition to EIA to occur in June.

Boeing currently has two Dreamlifters in operation, with a third now under construction. Eventually, four Dreamlifters will be utilized to ferry subcontractor-assembled components of the 787 to Everett.

FMI: www.boeing.com

Advertisement

More News

Aero-TV: Garmin’s GNC-255 –- Back To Basics

Garmin's New Aviation VHF Radios Early this year, a new series of aviation VHF COM and NAV/COM radios, the GTR and GNC series, was announced by Garmin. As the replacement products >[...]

EADS And Siemens Enter Long-Term Research Partnership

Sign MoU With Diamond Aircraft On Electric Propulsion System EADS and Siemens are entering into a long-term research partnership to introduce new electric propulsion systems that c>[...]

ANN's Daily Aero-Term (06.19.13): Ceiling

The heights above the earth's surface of the lowest layer of clouds or obscuring phenomena that is reported as broken, overcast, or obscuration, and not classified as thin or parti>[...]

ANN's Daily Aero-Linx (06.19.13)

The Army Aviation Heritage Foundation The Army Aviation Heritage Foundation (AAHF) is a non-profit public educational foundation dedicated to presenting the Army Aviation story to >[...]

Aero-News: Quote Of The Day (06.19.13)

“The serial electric propulsion allows us to design airplanes with totally different characteristics than today. Vertical take-off and high-speed cruise can be realized in a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC