AD: Eurocopter France Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 11.21.14 ** HD iPad-Friendly -- Airborne 11.21.14 **
** Airborne 11.19.14 ** HD iPad-Friendly -- Airborne 11.19.14 **
** Airborne 11.17.14 ** HD iPad-Friendly -- Airborne 11.17.14 **

Thu, Mar 21, 2013

AD: Eurocopter France Helicopters

AD NUMBER: 2013-05-23

PRODUCT: Eurocopter France (Eurocopter) Model AS332C, L, and L1 helicopters to require a one-time inspection of the main rotor head (MRH) swash-plate upper bearing (bearing) for a non-smooth point (friction point).
SUBJECT: Airworthiness Directive 2013-05-23
ACTION: Final Rule

SUMMARY:  This AD was prompted by a report of the premature deterioration of the MRH bearing of the rotating star installed on a Model AS332L1 helicopter. The actions of this AD are intended to detect deterioration of the MRH bearing and to prevent overloading the scissor links which drive the main rotor system, failure of the scissors links, and subsequent loss of control of the helicopter.

DATES: This AD is effective April 24, 2013.

FMI: AD

Advertisement

More News

Airborne 11.21.14: AEA's 3Q/14 Report, Fantasy Of Flight, Modernizing The NAS

Also: Holland Wants Gold, FAA Strangling UAVs?, RAF WWII Trainer For Sale, Bf109s Live, Georgia v Aerospace Engineers The Aircraft Electronics Association has released its third-qu>[...]

Aero-News: Quote Of The Day (11.23.14)

"Reaching this stage that we call ATLO is a critical milestone. This is a very satisfying point of the mission as we transition from many teams working on their individual elements>[...]

ANN FAQ: Getting The Most Out Of ANN's Newsletters

ANN goes through a lot of trouble to make the graphics flashy and cool and an integral part of the story. But let's face it, they're bandwidth-intensive. So here are a couple of th>[...]

Air Force Funds Research On Thermal Management Technology For Fighters

Heat Generated By Electronic Systems A Growing Challenge Managing heat that is generated by electronic subsystems in next-generation aircraft is a vexing challenge for aerospace sy>[...]

Raytheon Successfully Demonstrates Airborne Electronic Attack System

Prototype Test Flights Evaluate Integrated Electronic Warfare Capabilities The U.S. Navy and Raytheon successfully demonstrated an end to end, first of its kind, integrated electro>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC