AD: GA 8 Airvan (Pty) Ltd Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Apr 19, 2019

AD: GA 8 Airvan (Pty) Ltd Airplanes

AD NUMBER: 2019-07-08

PRODUCT: GA 8 Airvan (Pty) Ltd Model GA8 and Model GA8-TC320 airplanes.

ACTION: Final Rule.

SUMMARY: This AD results from mandatory continuing airworthiness information (MCAI) issued by an aviation authority of another country to identify and correct an unsafe condition on an aviation product.

The MCAI describes the unsafe condition as certain wing strut fittings manufactured with incorrect grain orientation, which has an unknown effect on fatigue related concerns.

DATES: This AD is effective May 23, 2019.

COST: The FAA estimates that this AD would affect 50 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

The average labor rate is $85 per work-hour. It would take about 8 work-hours and $200 for parts to do the initial inspections of this AD, for a cost of $880 per airplane. It would take about 5 work-hours and $200 for parts to do the repetitive inspections, for a cost of $625 per airplane per inspection cycle.

In addition, The FAA estimates that replacing the struts and strut fittings would take about 10 workhours and require parts costing $7,000, for a cost of $7,850 per airplane . Reporting the inspection findings would require about 1 work-hour, for a cost of $85 per airplane and $4,250 per inspection cycle. According to the manufacturer, some of the costs of this AD may be covered under warranty, thereby reducing the cost impact on affected individuals.

FMI: AD

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC